US Army Corps of Engineers

Cougar Dam

April 2025

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow cfsTotal Outflow cfsGeneration Flow cfsSpill cfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feetMidnight Storage kaf
1 1939 3040 1575.85 1577.39 1255.12 322.27 79294.63
2 1830 3070 1572.29 1574.02 1255.14 318.88 76802.39
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
TOT            
AVG    1885 3055   1574.07 1575.70 1255.13 320.58 78048.51
MAX    1939 3070   1575.85 1577.39 1255.14 322.27 79294.63
MIN    1830 3040   1572.29 1574.02 1255.12 318.88 76802.39