US Army Corps of Engineers

Grand Coulee Dam

May 2026

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow kcfsTotal Outflow kcfsGeneration Flow kcfsSpill kcfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feetBanks Lake Pump kcfsBanks Lake Pump MWhBanks Lake Elev
1 84404 3517 200 124.60 160.00 160.00 0.00 1252.00 1252.49 967.08 285.41 2.68 1968 1569.15
2 68412 2850 199 122.60 130.40 130.40 0.00 1251.60 1251.72 964.00 287.72 5.90 4406 1569.11
3 133.90 127.00 127.00 0.00 1251.60 1251.59 963.19 288.40 1569.06
4 138.00 143.00 143.00 0.00 1251.30 1251.50 964.71 286.79 1568.97
5 137.60 136.40 136.40 0.00 1251.20 1251.31 963.86 287.45 1568.74
6 142.00 93.50 93.50 0.00 1252.50 1251.77 960.05 291.72 1568.62
7 144.60 97.10 97.10 0.00 1253.70 1253.15 960.23 292.92 1568.52
8 138.00 106.50 106.50 0.00 1254.40 1253.96 961.47 292.49 1568.62
9 142.70 123.10 123.10 0.00 1254.70 1254.48 962.68 291.80 1568.69
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOT152816  399           
AVG 76408 3184 200 136.00 124.11 124.11 0.00 1252.56 1252.44 963.03 289.41 4.29 3187 1568.83
MAX 84404   144.60 160.00 160.00 0.00 1254.70 1254.48 967.08 292.92 5.90 4406 1569.15
MIN 68412   122.60 93.50 93.50 0.00 1251.20 1251.31 960.05 285.41 2.68 1968 1568.52