US Army Corps of Engineers

Lost Creek Dam

April 2025

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow cfsTotal Outflow cfsGeneration Flow cfsSpill cfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feetMidnight Storage ac-ft
1 3414 3300 1860.36 1860.34 1551.50 308.84413579.96
2 3172 3040 1860.40 1860.38 1551.50 308.88413705.99
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
TOT            
AVG    3293 3170   1860.38 1860.36 1551.50 308.86413642.97
MAX    3414 3300   1860.40 1860.38 1551.50 308.88413705.99
MIN    3172 3040   1860.36 1860.34 1551.50 308.84413579.96