US Army Corps of Engineers

Lost Creek Dam

October 2026

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow cfsTotal Outflow cfsGeneration Flow cfsSpill cfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feetMidnight Storage ac-ft
1 795 1010 1785.90 1785.24 1551.50 233.74212004.99
2 796 1000 1785.70 1785.80 1551.50 234.30211567.99
3 795 1000 1785.51 1785.61 1551.50 234.11211152.88
4 786 1010 1785.32 1785.41 1551.50 233.91210738.58
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
TOT            
AVG    793 1005   1785.61 1785.51 1551.50 234.01211366.11
MAX    796 1010   1785.90 1785.80 1551.50 234.30212004.99
MIN    786 1000   1785.32 1785.24 1551.50 233.74210738.58