US Army Corps of Engineers

McNary Dam & Lake Wallula

July 2025

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow kcfsTotal Outflow kcfsGeneration Flow kcfsSpill kcfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feet
1 138.00 148.40 73.80 69.90 338.25 338.72 264.89 73.83
2 149.00 144.40 54.50 85.20 338.50 338.40 265.05 73.35
3 141.00 138.80 51.90 82.20 338.59 338.52 264.63 73.89
4 129.30 125.00 52.70 67.60 338.81 338.60 264.57 74.03
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOT           
AVG    139.32 139.15 58.23 76.22 338.54 338.56 264.79 73.78
MAX    149.00 148.40 73.80 85.20 338.81 338.72 265.05 74.03
MIN    129.30 125.00 51.90 67.60 338.25 338.40 264.57 73.35