US Army Corps of Engineers

McNary Dam & Lake Wallula

April 2026

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow kcfsTotal Outflow kcfsGeneration Flow kcfsSpill kcfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feet
1 225.10 224.10 186.80 34.60 339.40 339.25 268.56 70.69
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
TOT           
AVG    225.10 224.10 186.80 34.60 339.40 339.25 268.56 70.69
MAX    225.10 224.10 186.80 34.60 339.40 339.25 268.56 70.69
MIN    225.10 224.10 186.80 34.60 339.40 339.25 268.56 70.69