US Army Corps of Engineers

Albeni Falls Dam on Pend Oreille River

July 2025


Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow kcfsTotal Outflow kcfsGeneration Flow kcfsSpill kcfsMidnight Hope ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feetMidnight Forebay Lake Elevation
1 818 34 5 20.60 17.80 17.80 0.00 2062.30 2061.76 2034.49 27.27 2062.00
2 828 34 5 18.10 18.10 18.10 0.00 2062.30 2061.88 2034.69 27.19 2061.90
3 772 32 5 11.00 16.70 16.70 0.00 2062.18 2061.82 2034.40 27.42 2061.90
4 6.10 9.40 9.40 0.00 2062.11 2061.91 2032.72 29.19 2062.00
5 15.10 8.00 8.00 0.00 2062.26 2061.97 2031.65 30.32 2062.10
6 13.40 13.90 13.90 0.00 2062.25 2061.95 2033.04 28.91 2061.90
7 13.70 16.10 16.10 0.00 2062.20 2061.90 2034.04 27.86 2062.00
8 14.80 12.40 12.40 0.00 2062.25 2061.91 2033.26 28.65 2062.00
9 14.10 11.30 11.30 0.00 2062.31 2061.91 2032.78 29.13 2062.10
10 14.50 13.10 13.10 0.00 2062.34 2061.99 2033.13 28.86 2062.10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOT 2418  15         
AVG 806 34 5 14.14 13.68 13.68 0.00 2062.25 2061.90 2033.42 28.48 2062.00
MAX 828   20.60 18.10 18.10 0.00 2062.34 2061.99 2034.69 30.32 2062.10
MIN 772   6.10 8.00 8.00 0.00 2062.11 2061.76 2031.65 27.19 2061.90