US Army Corps of Engineers

Bonneville Dam

Wednesday May 13, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 224.20 60.20151.60 75.60 18.70 56.90 75.50 76.80 18.70
2 224.20 60.30151.50 75.60 18.70 56.90 75.50 76.80 18.70
3 224.60 60.60151.60 75.70 18.60 57.10 75.50 76.80 18.60
4 224.90 60.80151.70 75.80 18.70 57.10 75.60 76.90 18.70
5 224.40 60.30151.70 75.90 18.70 57.20 75.70 77.00 18.70
6 224.80 60.60151.80 75.80 18.70 57.10 75.60 76.90 18.80
7 233.90 70.20151.30 75.40 19.20 56.20 75.30 76.70 19.20
8 221.90 57.80151.70 76.00 18.70 57.30 75.50 76.80 18.80
9 220.80 56.40152.00 76.00 18.70 57.30 75.80 77.10 18.80
10 220.30 55.80152.10 76.00 18.70 57.30 75.80 77.10 18.70
11 220.20 55.80152.00 76.00 18.60 57.40 75.80 77.10 18.70
12 220.50 56.10152.00 76.00 18.60 57.40 75.80 77.10 18.60
13 220.00 55.70151.90 75.90 18.60 57.30 75.80 77.10 18.70
14 220.30 56.00151.90 76.00 18.50 57.50 75.80 77.00 18.60
15 220.10 55.60152.10 76.10 18.50 57.60 76.00 77.30 18.70
16 221.30 56.60152.30 76.10 18.70 57.40 75.80 77.30 18.80
17 240.00 75.70151.90 75.90 19.30 56.60 75.70 77.20 19.40
18 244.80 80.60151.80 75.90 19.60 56.30 75.70 77.20 19.60
19
20
21
22
23
24
AVG 225.07 60.84151.83 75.87 18.77 57.11 75.68 77.01 18.82
MAX 244.80 80.60152.30 76.10 19.60 57.60 76.00 77.30 19.60
MIN 220.00 55.60151.30 75.40 18.50 56.20 75.30 76.70 18.60

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 75.6 75.5 60.20 18 12.4
2 0.00 75.6 75.5 60.30 18 12.4
3 0.00 75.7 75.5 60.60 18 12.4
4 0.00 75.8 75.6 60.80 18 12.4
5 0.00 75.9 75.7 60.30 18 12.4
6 0.00 75.8 75.6 60.60 18 12.4
7 0.00 75.4 75.3 70.20 18 12.4
8 0.00 76.0 75.5 57.80 18 12.4
9 0.00 76.0 75.8 56.40 18 12.4
10 0.00 76.0 75.8 55.80 18 12.4
11 0.00 76.0 75.8 55.80 18 12.4
12 0.00 76.0 75.8 56.10 18 12.4
13 0.00 75.9 75.8 55.70 18 12.4
14 0.00 76.0 75.8 56.00 18 12.4
15 0.00 76.1 76.0 55.60 18 12.4
16 0.00 76.1 75.8 56.60 18 12.4
17 0.00 75.9 75.7 75.70 18 12.4
18 0.00 75.9 75.7 80.60 18 12.4
19
20
21
22
23
24
AVG 0.00 75.9 75.7 60.84 18 12.4
MAX 0.00 76.1 76.0 80.60 18 12.4
MIN 0.00 75.4 75.3 55.60 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.