US Army Corps of Engineers

Bonneville Dam

Friday May 8, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 218.10 55.30150.40 74.90 18.20 56.70 74.70 76.00 18.20
2 218.00 55.30150.30 74.90 18.20 56.70 74.70 76.00 18.20
3 218.10 55.30150.40 74.90 18.20 56.70 74.70 76.00 18.30
4 218.00 55.20150.40 74.90 18.20 56.70 74.80 76.00 18.30
5 218.20 55.50150.30 74.90 18.20 56.70 74.80 76.00 18.20
6 221.80 59.10150.30 74.90 18.30 56.60 74.70 76.00 18.30
7 219.40 56.80150.20 74.80 18.30 56.50 74.60 76.00 18.30
8 221.30 58.80150.10 74.70 18.30 56.40 74.50 75.90 18.40
9 221.00 58.60150.00 74.70 18.40 56.30 74.50 75.90 18.40
10 221.80 59.30150.10 74.80 18.30 56.50 74.60 75.90 18.40
11 221.20 58.70150.10 74.80 18.40 56.40 74.60 75.90 18.40
12 220.30 57.80150.10 74.70 18.60 56.10 74.50 75.90 18.50
13 219.80 57.40150.00 74.70 18.40 56.30 74.50 75.90 18.40
14 221.40 59.00150.00 74.50 18.50 56.00 74.30 75.90 18.50
15 234.00 71.90149.70 74.40 18.90 55.50 74.30 75.80 19.00
16 234.70 72.70149.60 74.30 19.00 55.30 74.20 75.80 19.00
17 233.80 71.90149.50 74.40 19.00 55.40 74.20 75.80 19.10
18 234.00 72.10149.50 74.30 19.00 55.30 74.30 75.70 19.00
19 234.60 72.70149.50 74.40 19.20 55.20 74.20 75.70 19.10
20 233.20 71.20149.60 74.40 18.90 55.50 74.30 75.80 19.00
21 234.30 72.10149.80 74.50 19.00 55.50 74.40 75.80 19.00
22 241.10 79.00149.70 74.40 19.30 55.10 74.30 75.80 19.30
23 242.30 80.30149.60 74.60 19.20 55.40 74.40 75.80 19.20
24 223.90 61.40150.10 74.80 18.60 56.20 74.70 75.90 18.60
AVG 226.01 63.64149.97 74.65 18.61 56.04 74.49 75.88 18.63
MAX 242.30 80.30150.40 74.90 19.30 56.70 74.80 76.00 19.30
MIN 218.00 55.20149.50 74.30 18.20 55.10 74.20 75.70 18.20

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.9 74.7 55.30 18 12.4
2 0.00 74.9 74.7 55.30 18 12.4
3 0.00 74.9 74.7 55.30 18 12.4
4 0.00 74.9 74.8 55.20 18 12.4
5 0.00 74.9 74.8 55.50 18 12.4
6 0.00 74.9 74.7 59.10 18 12.4
7 0.00 74.8 74.6 56.80 18 12.4
8 0.00 74.7 74.5 58.80 18 12.4
9 0.00 74.7 74.5 58.60 18 12.4
10 0.00 74.8 74.6 59.30 18 12.4
11 0.00 74.8 74.6 58.70 18 12.4
12 0.00 74.7 74.5 57.80 18 12.4
13 0.00 74.7 74.5 57.40 18 12.4
14 0.00 74.5 74.3 59.00 18 12.4
15 0.00 74.4 74.3 71.90 18 12.4
16 0.00 74.3 74.2 72.70 18 12.4
17 0.00 74.4 74.2 71.90 18 12.4
18 0.00 74.3 74.3 72.10 18 12.4
19 0.00 74.4 74.2 72.70 18 12.4
20 0.00 74.4 74.3 71.20 18 12.4
21 0.00 74.5 74.4 72.10 18 12.4
22 0.00 74.4 74.3 79.00 18 12.4
23 0.00 74.6 74.4 80.30 18 12.4
24 0.00 74.8 74.7 61.40 18 12.4
AVG 0.00 74.7 74.5 63.64 18 12.4
MAX 0.00 74.9 74.8 80.30 18 12.4
MIN 0.00 74.3 74.2 55.20 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.