US Army Corps of Engineers

Bonneville Dam

Monday May 19, 2025

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 195.10 33.30149.40 74.30 16.60 57.70 74.00 75.30 16.40
2 195.00 33.30149.30 74.20 16.60 57.60 74.00 75.20 16.40
3 195.00 33.40149.20 74.10 16.70 57.40 73.90 75.10 16.60
4 194.60 33.10149.10 74.10 16.50 57.60 73.90 75.10 16.50
5 194.70 33.20149.10 74.10 16.50 57.60 73.80 75.00 16.40
6 194.50 33.20148.90 74.00 16.50 57.50 73.70 75.00 16.30
7 194.40 33.10148.90 74.10 16.50 57.60 73.80 75.00 16.30
8 194.50 33.00149.10 74.10 16.50 57.60 73.90 75.10 16.40
9 194.80 33.20149.20 74.20 16.50 57.70 73.90 75.10 16.30
10 194.80 33.20149.20 74.20 16.50 57.70 73.90 75.10 16.30
11 194.60 33.10149.10 74.00 16.50 57.50 73.70 75.00 16.30
12 194.10 33.00148.70 73.80 16.50 57.30 73.60 74.80 16.40
13 193.80 33.00148.40 73.60 16.50 57.10 73.40 74.70 16.40
14 193.60 33.10148.10 73.40 16.50 56.90 73.20 74.50 16.40
15 193.20 33.00147.80 73.20 16.50 56.70 73.00 74.30 16.30
16 193.20 33.10147.70 73.10 16.50 56.60 72.90 74.20 16.50
17 192.90 33.00147.50 73.10 16.50 56.60 72.90 74.10 16.40
18 193.60 33.10148.10 72.90 16.60 56.30 72.80 74.10 16.30
19 194.20 32.80149.00 72.90 16.50 56.40 72.70 74.00 16.30
20 194.20 32.80149.00 73.10 16.50 56.60 72.80 74.10 16.40
21 194.60 32.90149.30 73.10 16.40 56.70 73.00 74.20 16.40
22 194.70 32.90149.40 73.20 16.40 56.80 73.00 74.20 16.40
23 194.90 33.10149.40 73.30 16.50 56.80 73.00 74.30 16.40
24 194.70 32.70149.60 73.30 16.50 56.80 73.10 74.40 16.30
AVG 194.32 33.07148.85 73.64 16.51 57.13 73.41 74.66 16.38
MAX 195.10 33.40149.60 74.30 16.70 57.70 74.00 75.30 16.60
MIN 192.90 32.70147.50 72.90 16.40 56.30 72.70 74.00 16.30

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.3 74.0 33.30 18 12.4
2 0.00 74.2 74.0 33.30 18 12.4
3 0.00 74.1 73.9 33.40 18 12.4
4 0.00 74.1 73.9 33.10 18 12.4
5 0.00 74.1 73.8 33.20 18 12.4
6 0.00 74.0 73.7 33.20 18 12.4
7 0.00 74.1 73.8 33.10 18 12.4
8 0.00 74.1 73.9 33.00 18 12.4
9 0.00 74.2 73.9 33.20 18 12.4
10 0.00 74.2 73.9 33.20 18 12.4
11 0.00 74.0 73.7 33.10 18 12.4
12 0.00 73.8 73.6 33.00 18 12.4
13 0.00 73.6 73.4 33.00 18 12.4
14 0.00 73.4 73.2 33.10 18 12.4
15 0.00 73.2 73.0 33.00 18 12.4
16 0.00 73.1 72.9 33.10 18 12.4
17 0.00 73.1 72.9 33.00 18 12.4
18 0.00 72.9 72.8 33.10 18 12.4
19 0.00 72.9 72.7 32.80 18 12.4
20 0.00 73.1 72.8 32.80 18 12.4
21 0.00 73.1 73.0 32.90 18 12.4
22 0.00 73.2 73.0 32.90 18 12.4
23 0.00 73.3 73.0 33.10 18 12.4
24 0.00 73.3 73.1 32.70 18 12.4
AVG 0.00 73.6 73.4 33.07 18 12.4
MAX 0.00 74.3 74.0 33.40 18 12.4
MIN 0.00 72.9 72.7 32.70 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.