US Army Corps of Engineers

Bonneville Dam

Sunday May 18, 2025

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 225.60 61.60151.60 74.70 18.40 56.30 74.40 75.90 18.20
2 225.40 61.40151.60 74.60 18.30 56.30 74.40 75.90 18.30
3 225.50 61.50151.60 74.70 18.40 56.30 74.40 75.90 18.30
4 225.80 61.80151.60 74.60 18.50 56.10 74.40 75.90 18.50
5 225.90 62.00151.50 74.60 18.40 56.20 74.40 75.80 18.30
6 224.10 60.80150.90 75.00 18.10 56.90 74.70 75.80 18.00
7 206.80 44.10150.30 75.00 17.60 57.40 74.70 76.00 17.50
8 205.70 43.00150.30 74.80 18.10 56.70 74.50 75.90 17.50
9 205.60 43.20150.00 74.60 17.50 57.10 74.40 75.70 17.40
10 205.40 43.20149.80 74.60 17.50 57.10 74.30 75.60 17.40
11 205.00 42.80149.80 74.60 17.60 57.00 74.30 75.60 17.40
12 205.40 43.30149.70 74.40 17.50 56.90 74.20 75.50 17.30
13 205.70 43.70149.60 74.30 17.50 56.80 74.10 75.50 17.40
14 205.00 43.10149.50 74.30 17.50 56.80 74.20 75.40 17.30
15 204.90 43.10149.40 74.20 17.60 56.60 74.00 75.40 17.40
16 204.80 43.10149.30 74.10 17.40 56.70 73.90 75.30 17.20
17 205.30 43.70149.20 74.20 17.40 56.80 73.90 75.20 17.20
18 194.70 32.90149.40 74.30 16.90 57.40 74.00 75.20 16.70
19 195.00 33.20149.40 74.20 16.80 57.40 74.00 75.20 16.70
20 194.40 32.60149.40 74.30 16.70 57.60 74.10 75.20 16.60
21 194.10 32.30149.40 74.30 16.70 57.60 74.10 75.30 16.50
22 193.60 31.80149.40 74.40 16.60 57.80 74.00 75.30 16.50
23 195.00 33.10149.50 74.30 16.60 57.70 74.10 75.30 16.60
24 195.00 33.10149.50 74.40 16.60 57.80 74.10 75.30 16.50
AVG 207.24 44.77150.07 74.48 17.51 56.97 74.23 75.55 17.36
MAX 225.90 62.00151.60 75.00 18.50 57.80 74.70 76.00 18.50
MIN 193.60 31.80149.20 74.10 16.60 56.10 73.90 75.20 16.50

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.7 74.4 61.60 18 12.4
2 0.00 74.6 74.4 61.40 18 12.4
3 0.00 74.7 74.4 61.50 18 12.4
4 0.00 74.6 74.4 61.80 18 12.4
5 0.00 74.6 74.4 62.00 18 12.4
6 0.00 75.0 74.7 60.80 18 12.4
7 0.00 75.0 74.7 44.10 18 12.4
8 0.00 74.8 74.5 43.00 18 12.4
9 0.00 74.6 74.4 43.20 18 12.4
10 0.00 74.6 74.3 43.20 18 12.4
11 0.00 74.6 74.3 42.80 18 12.4
12 0.00 74.4 74.2 43.30 18 12.4
13 0.00 74.3 74.1 43.70 18 12.4
14 0.00 74.3 74.2 43.10 18 12.4
15 0.00 74.2 74.0 43.10 18 12.4
16 0.00 74.1 73.9 43.10 18 12.4
17 0.00 74.2 73.9 43.70 18 12.4
18 0.00 74.3 74.0 32.90 18 12.4
19 0.00 74.2 74.0 33.20 18 12.4
20 0.00 74.3 74.1 32.60 18 12.4
21 0.00 74.3 74.1 32.30 18 12.4
22 0.00 74.4 74.0 31.80 18 12.4
23 0.00 74.3 74.1 33.10 18 12.4
24 0.00 74.4 74.1 33.10 18 12.4
AVG 0.00 74.5 74.2 44.77 18 12.4
MAX 0.00 75.0 74.7 62.00 18 12.4
MIN 0.00 74.1 73.9 31.80 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.