Bonneville Dam
Saturday May 17, 2025
Hour | Total Outflow kcfs | Generation Flow kcfs | Spill kcfs | PH 1 Forebay Elevation | Tailwater Elevation | Average Head | Project Forebay Elevation | Stevenson Gage Elevation | Project Tailwater Elevation |
1 | 224.40 | 61.50 | 150.50 | 74.00 | 18.10 | 55.90 | 73.80 | 75.20 | 18.00 |
2 | 224.70 | 61.60 | 150.70 | 74.10 | 18.20 | 55.90 | 73.80 | 75.30 | 18.10 |
3 | 224.80 | 61.60 | 150.80 | 74.10 | 18.20 | 55.90 | 73.90 | 75.40 | 18.10 |
4 | 224.80 | 61.50 | 150.90 | 74.30 | 18.30 | 56.00 | 74.00 | 75.50 | 18.10 |
5 | 225.00 | 61.60 | 151.00 | 74.30 | 18.30 | 56.00 | 74.10 | 75.50 | 18.10 |
6 | 225.10 | 61.60 | 151.10 | 74.40 | 18.30 | 56.10 | 74.20 | 75.60 | 18.10 |
7 | 211.50 | 47.50 | 151.60 | 74.70 | 17.70 | 57.00 | 74.50 | 75.80 | 17.60 |
8 | 210.10 | 46.00 | 151.70 | 74.50 | 17.70 | 56.80 | 74.30 | 75.70 | 17.50 |
9 | 209.70 | 46.00 | 151.30 | 74.40 | 17.70 | 56.70 | 74.10 | 75.50 | 17.50 |
10 | 210.60 | 47.10 | 151.10 | 74.30 | 17.90 | 56.40 | 74.10 | 75.50 | 17.60 |
11 | 209.70 | 46.30 | 151.00 | 74.30 | 17.70 | 56.60 | 74.10 | 75.40 | 17.60 |
12 | 210.10 | 46.80 | 150.90 | 74.20 | 17.80 | 56.40 | 74.00 | 75.40 | 17.70 |
13 | 210.00 | 46.70 | 150.90 | 73.90 | 17.80 | 56.10 | 74.00 | 75.30 | 17.80 |
14 | 210.30 | 47.10 | 150.80 | 74.20 | 17.90 | 56.30 | 74.00 | 75.30 | 17.60 |
15 | 210.40 | 47.10 | 150.90 | 74.00 | 17.70 | 56.30 | 74.00 | 75.30 | 17.70 |
16 | 210.60 | 47.30 | 150.90 | 74.20 | 18.00 | 56.20 | 74.00 | 75.40 | 17.70 |
17 | 209.00 | 45.70 | 150.90 | 74.20 | 17.70 | 56.50 | 74.00 | 75.40 | 17.60 |
18 | 210.20 | 46.90 | 150.90 | 74.10 | 17.80 | 56.30 | 73.80 | 75.40 | 17.60 |
19 | 223.30 | 60.30 | 150.60 | 74.20 | 18.20 | 56.00 | 74.10 | 75.50 | 18.10 |
20 | 225.10 | 61.70 | 151.00 | 74.40 | 18.30 | 56.10 | 74.10 | 75.60 | 18.20 |
21 | 225.50 | 61.80 | 151.30 | 74.50 | 18.30 | 56.20 | 74.30 | 75.80 | 18.10 |
22 | 225.20 | 61.30 | 151.50 | 74.60 | 18.30 | 56.30 | 74.40 | 75.80 | 18.20 |
23 | 225.30 | 61.40 | 151.50 | 74.80 | 18.40 | 56.40 | 74.50 | 75.90 | 18.30 |
24 | 225.60 | 61.40 | 151.80 | 74.70 | 18.40 | 56.30 | 74.40 | 75.90 | 18.20 |
|
AVG | 217.54 | 54.07 | 151.07 | 74.31 | 18.03 | 56.28 | 74.10 | 75.52 | 17.88 |
|
MAX | 225.60 | 61.80 | 151.80 | 74.80 | 18.40 | 57.00 | 74.50 | 75.90 | 18.30 |
MIN | 209.00 | 45.70 | 150.50 | 73.90 | 17.70 | 55.90 | 73.80 | 75.20 | 17.50 |
|
Powerhouse 1 |
Powerhouse 2 |
Project |
Hour | Generation Flow kcfs | Forebay Elevation | Forebay Elevation | Generation Flow kcfs | Spillway Gates in Use | Miscellaneous Flow kcfs* |
1 | 0.00 | 74.0 | 73.8 | 61.50 | 18 | 12.4 |
2 | 0.00 | 74.1 | 73.8 | 61.60 | 18 | 12.4 |
3 | 0.00 | 74.1 | 73.9 | 61.60 | 18 | 12.4 |
4 | 0.00 | 74.3 | 74.0 | 61.50 | 18 | 12.4 |
5 | 0.00 | 74.3 | 74.1 | 61.60 | 18 | 12.4 |
6 | 0.00 | 74.4 | 74.2 | 61.60 | 18 | 12.4 |
7 | 0.00 | 74.7 | 74.5 | 47.50 | 18 | 12.4 |
8 | 0.00 | 74.5 | 74.3 | 46.00 | 18 | 12.4 |
9 | 0.00 | 74.4 | 74.1 | 46.00 | 18 | 12.4 |
10 | 0.00 | 74.3 | 74.1 | 47.10 | 18 | 12.4 |
11 | 0.00 | 74.3 | 74.1 | 46.30 | 18 | 12.4 |
12 | 0.00 | 74.2 | 74.0 | 46.80 | 18 | 12.4 |
13 | 0.00 | 73.9 | 74.0 | 46.70 | 18 | 12.4 |
14 | 0.00 | 74.2 | 74.0 | 47.10 | 18 | 12.4 |
15 | 0.00 | 74.0 | 74.0 | 47.10 | 18 | 12.4 |
16 | 0.00 | 74.2 | 74.0 | 47.30 | 18 | 12.4 |
17 | 0.00 | 74.2 | 74.0 | 45.70 | 18 | 12.4 |
18 | 0.00 | 74.1 | 73.8 | 46.90 | 18 | 12.4 |
19 | 0.00 | 74.2 | 74.1 | 60.30 | 18 | 12.4 |
20 | 0.00 | 74.4 | 74.1 | 61.70 | 18 | 12.4 |
21 | 0.00 | 74.5 | 74.3 | 61.80 | 18 | 12.4 |
22 | 0.00 | 74.6 | 74.4 | 61.30 | 18 | 12.4 |
23 | 0.00 | 74.8 | 74.5 | 61.40 | 18 | 12.4 |
24 | 0.00 | 74.7 | 74.4 | 61.40 | 18 | 12.4 |
|
AVG | 0.00 | 74.3 | 74.1 | 54.07 | 18 | 12.4 |
|
MAX | 0.00 | 74.8 | 74.5 | 61.80 | 18 | 12.4 |
MIN | 0.00 | 73.9 | 73.8 | 45.70 | 18 | 12.4 |
* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock,
PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in
operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through
the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year
indicate the B2CC is open/closed.