US Army Corps of Engineers

Bonneville Dam

Saturday May 17, 2025

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 224.40 61.50150.50 74.00 18.10 55.90 73.80 75.20 18.00
2 224.70 61.60150.70 74.10 18.20 55.90 73.80 75.30 18.10
3 224.80 61.60150.80 74.10 18.20 55.90 73.90 75.40 18.10
4 224.80 61.50150.90 74.30 18.30 56.00 74.00 75.50 18.10
5 225.00 61.60151.00 74.30 18.30 56.00 74.10 75.50 18.10
6 225.10 61.60151.10 74.40 18.30 56.10 74.20 75.60 18.10
7 211.50 47.50151.60 74.70 17.70 57.00 74.50 75.80 17.60
8 210.10 46.00151.70 74.50 17.70 56.80 74.30 75.70 17.50
9 209.70 46.00151.30 74.40 17.70 56.70 74.10 75.50 17.50
10 210.60 47.10151.10 74.30 17.90 56.40 74.10 75.50 17.60
11 209.70 46.30151.00 74.30 17.70 56.60 74.10 75.40 17.60
12 210.10 46.80150.90 74.20 17.80 56.40 74.00 75.40 17.70
13 210.00 46.70150.90 73.90 17.80 56.10 74.00 75.30 17.80
14 210.30 47.10150.80 74.20 17.90 56.30 74.00 75.30 17.60
15 210.40 47.10150.90 74.00 17.70 56.30 74.00 75.30 17.70
16 210.60 47.30150.90 74.20 18.00 56.20 74.00 75.40 17.70
17 209.00 45.70150.90 74.20 17.70 56.50 74.00 75.40 17.60
18 210.20 46.90150.90 74.10 17.80 56.30 73.80 75.40 17.60
19 223.30 60.30150.60 74.20 18.20 56.00 74.10 75.50 18.10
20 225.10 61.70151.00 74.40 18.30 56.10 74.10 75.60 18.20
21 225.50 61.80151.30 74.50 18.30 56.20 74.30 75.80 18.10
22 225.20 61.30151.50 74.60 18.30 56.30 74.40 75.80 18.20
23 225.30 61.40151.50 74.80 18.40 56.40 74.50 75.90 18.30
24 225.60 61.40151.80 74.70 18.40 56.30 74.40 75.90 18.20
AVG 217.54 54.07151.07 74.31 18.03 56.28 74.10 75.52 17.88
MAX 225.60 61.80151.80 74.80 18.40 57.00 74.50 75.90 18.30
MIN 209.00 45.70150.50 73.90 17.70 55.90 73.80 75.20 17.50

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.0 73.8 61.50 18 12.4
2 0.00 74.1 73.8 61.60 18 12.4
3 0.00 74.1 73.9 61.60 18 12.4
4 0.00 74.3 74.0 61.50 18 12.4
5 0.00 74.3 74.1 61.60 18 12.4
6 0.00 74.4 74.2 61.60 18 12.4
7 0.00 74.7 74.5 47.50 18 12.4
8 0.00 74.5 74.3 46.00 18 12.4
9 0.00 74.4 74.1 46.00 18 12.4
10 0.00 74.3 74.1 47.10 18 12.4
11 0.00 74.3 74.1 46.30 18 12.4
12 0.00 74.2 74.0 46.80 18 12.4
13 0.00 73.9 74.0 46.70 18 12.4
14 0.00 74.2 74.0 47.10 18 12.4
15 0.00 74.0 74.0 47.10 18 12.4
16 0.00 74.2 74.0 47.30 18 12.4
17 0.00 74.2 74.0 45.70 18 12.4
18 0.00 74.1 73.8 46.90 18 12.4
19 0.00 74.2 74.1 60.30 18 12.4
20 0.00 74.4 74.1 61.70 18 12.4
21 0.00 74.5 74.3 61.80 18 12.4
22 0.00 74.6 74.4 61.30 18 12.4
23 0.00 74.8 74.5 61.40 18 12.4
24 0.00 74.7 74.4 61.40 18 12.4
AVG 0.00 74.3 74.1 54.07 18 12.4
MAX 0.00 74.8 74.5 61.80 18 12.4
MIN 0.00 73.9 73.8 45.70 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.