US Army Corps of Engineers

Bonneville Dam

Tuesday May 5, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 232.60 71.70148.50 73.80 19.40 54.40 73.70 75.00 19.40
2 219.60 58.40148.80 73.80 19.00 54.80 73.70 75.10 19.10
3 220.70 59.40148.90 73.90 19.00 54.90 73.80 75.20 19.00
4 219.00 57.60149.00 74.00 18.90 55.10 73.90 75.30 18.80
5 219.50 57.90149.20 74.10 18.90 55.20 74.00 75.40 18.90
6 229.70 68.20149.10 74.10 19.10 55.00 73.90 75.40 19.20
7 234.60 73.00149.20 74.10 19.30 54.80 73.90 75.50 19.30
8 233.60 72.00149.20 74.30 19.00 55.30 74.30 75.50 19.10
9 221.90 59.90149.60 74.40 18.80 55.60 74.30 75.60 18.80
10 218.70 56.50149.80 74.60 18.70 55.90 74.40 75.70 18.80
11 218.30 56.00149.90 74.70 18.70 56.00 74.50 75.80 18.80
12 218.30 55.90150.00 74.80 18.70 56.10 74.70 75.90 18.80
13 218.30 55.60150.30 74.90 18.70 56.20 74.70 76.10 18.70
14 218.80 56.00150.40 75.00 18.60 56.40 74.80 76.10 18.70
15 218.50 55.60150.50 75.00 18.70 56.30 74.90 76.20 18.70
16 233.30 70.60150.30 74.80 19.30 55.50 74.60 76.20 19.40
17 248.40 86.00150.00 74.60 19.80 54.80 74.50 76.10 19.80
18 261.50 99.50149.60 74.30 20.30 54.00 74.20 76.00 20.40
19 271.90 110.20149.30 73.90 21.20 52.70 73.80 75.90 21.00
20 285.80 124.60148.80 73.60 21.40 52.20 73.70 75.70 21.30
21 284.90 123.90148.60 73.50 21.50 52.00 73.50 75.50 21.20
22 285.80 125.10148.30 73.40 21.60 51.80 73.30 75.40 21.30
23 284.50 124.00148.10 73.70 21.00 52.70 73.60 75.20 21.00
24 267.40 106.60148.40 74.20 20.50 53.70 73.80 75.20 20.50
AVG 240.23 78.51149.33 74.23 19.59 54.64 74.10 75.63 19.58
MAX 285.80 125.10150.50 75.00 21.60 56.40 74.90 76.20 21.30
MIN 218.30 55.60148.10 73.40 18.60 51.80 73.30 75.00 18.70

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 73.8 73.7 71.70 18 12.4
2 0.00 73.8 73.7 58.40 18 12.4
3 0.00 73.9 73.8 59.40 18 12.4
4 0.00 74.0 73.9 57.60 18 12.4
5 0.00 74.1 74.0 57.90 18 12.4
6 0.00 74.1 73.9 68.20 18 12.4
7 0.00 74.1 73.9 73.00 18 12.4
8 0.00 74.3 74.3 72.00 18 12.4
9 0.00 74.4 74.3 59.90 18 12.4
10 0.00 74.6 74.4 56.50 18 12.4
11 0.00 74.7 74.5 56.00 18 12.4
12 0.00 74.8 74.7 55.90 18 12.4
13 0.00 74.9 74.7 55.60 18 12.4
14 0.00 75.0 74.8 56.00 18 12.4
15 0.00 75.0 74.9 55.60 18 12.4
16 0.00 74.8 74.6 70.60 18 12.4
17 0.00 74.6 74.5 86.00 18 12.4
18 16.00 74.3 74.2 83.50 18 12.4
19 24.40 73.9 73.8 85.80 18 12.4
20 37.80 73.6 73.7 86.80 18 12.4
21 37.20 73.5 73.5 86.70 18 12.4
22 38.80 73.4 73.3 86.30 18 12.4
23 37.20 73.7 73.6 86.80 18 12.4
24 26.00 74.2 73.8 80.60 18 12.4
AVG 9.06 74.2 74.1 69.45 18 12.4
MAX 38.80 75.0 74.9 86.80 18 12.4
MIN 0.00 73.4 73.3 55.60 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.