Bonneville Dam
Friday May 16, 2025
Hour | Total Outflow kcfs | Generation Flow kcfs | Spill kcfs | PH 1 Forebay Elevation | Tailwater Elevation | Average Head | Project Forebay Elevation | Stevenson Gage Elevation | Project Tailwater Elevation |
1 | 210.90 | 47.50 | 151.00 | 74.40 | 17.70 | 56.70 | 74.20 | 75.50 | 17.50 |
2 | 209.60 | 46.00 | 151.20 | 74.30 | 17.70 | 56.60 | 74.00 | 75.40 | 17.50 |
3 | 209.10 | 45.80 | 150.90 | 74.10 | 17.60 | 56.50 | 73.90 | 75.30 | 17.50 |
4 | 208.90 | 45.70 | 150.80 | 74.10 | 17.60 | 56.50 | 73.90 | 75.30 | 17.30 |
5 | 210.10 | 47.00 | 150.70 | 74.20 | 17.60 | 56.60 | 73.90 | 75.20 | 17.50 |
6 | 209.50 | 46.40 | 150.70 | 74.10 | 17.50 | 56.60 | 73.80 | 74.20 | 17.30 |
7 | 210.20 | 47.20 | 150.60 | 74.00 | 17.60 | 56.40 | 73.70 | 75.10 | 17.40 |
8 | 210.10 | 47.20 | 150.50 | 73.90 | 17.50 | 56.40 | 73.70 | 75.00 | 17.40 |
9 | 209.90 | 47.20 | 150.30 | 73.90 | 17.50 | 56.40 | 73.60 | 75.00 | 17.40 |
10 | 209.20 | 46.60 | 150.20 | 73.80 | 17.60 | 56.20 | 73.50 | 74.90 | 17.40 |
11 | 209.50 | 47.00 | 150.10 | 73.70 | 17.60 | 56.10 | 73.50 | 74.80 | 17.50 |
12 | 209.60 | 47.30 | 149.90 | 73.60 | 17.60 | 56.00 | 73.40 | 74.70 | 17.40 |
13 | 209.50 | 47.30 | 149.80 | 73.50 | 17.60 | 55.90 | 73.30 | 74.70 | 17.50 |
14 | 209.10 | 47.00 | 149.70 | 73.50 | 17.50 | 56.00 | 73.20 | 74.60 | 17.40 |
15 | 208.70 | 46.70 | 149.60 | 73.30 | 17.60 | 55.70 | 73.10 | 74.60 | 17.40 |
16 | 208.70 | 46.90 | 149.40 | 73.20 | 17.60 | 55.60 | 73.00 | 74.40 | 17.40 |
17 | 208.90 | 47.10 | 149.40 | 73.20 | 17.40 | 55.80 | 73.10 | 74.40 | 17.20 |
18 | 209.10 | 47.40 | 149.30 | 73.20 | 17.50 | 55.70 | 73.10 | 74.40 | 17.30 |
19 | 209.80 | 47.60 | 149.80 | 73.60 | 17.50 | 56.10 | 73.40 | 74.80 | 17.30 |
20 | 223.60 | 61.40 | 149.80 | 73.50 | 18.00 | 55.50 | 73.40 | 74.80 | 17.90 |
21 | 224.30 | 62.00 | 149.90 | 73.70 | 18.00 | 55.70 | 73.50 | 74.90 | 17.90 |
22 | 224.50 | 62.00 | 150.10 | 73.70 | 18.10 | 55.60 | 73.50 | 75.00 | 17.90 |
23 | 224.20 | 61.60 | 150.20 | 73.80 | 18.10 | 55.70 | 73.60 | 75.10 | 18.00 |
24 | 224.50 | 61.70 | 150.40 | 73.90 | 18.10 | 55.80 | 73.70 | 75.20 | 18.00 |
|
AVG | 212.56 | 49.98 | 150.18 | 73.76 | 17.67 | 56.09 | 73.54 | 74.89 | 17.51 |
|
MAX | 224.50 | 62.00 | 151.20 | 74.40 | 18.10 | 56.70 | 74.20 | 75.50 | 18.00 |
MIN | 208.70 | 45.70 | 149.30 | 73.20 | 17.40 | 55.50 | 73.00 | 74.20 | 17.20 |
|
Powerhouse 1 |
Powerhouse 2 |
Project |
Hour | Generation Flow kcfs | Forebay Elevation | Forebay Elevation | Generation Flow kcfs | Spillway Gates in Use | Miscellaneous Flow kcfs* |
1 | 0.00 | 74.4 | 74.2 | 47.50 | 18 | 12.4 |
2 | 0.00 | 74.3 | 74.0 | 46.00 | 18 | 12.4 |
3 | 0.00 | 74.1 | 73.9 | 45.80 | 18 | 12.4 |
4 | 0.00 | 74.1 | 73.9 | 45.70 | 18 | 12.4 |
5 | 0.00 | 74.2 | 73.9 | 47.00 | 18 | 12.4 |
6 | 0.00 | 74.1 | 73.8 | 46.40 | 18 | 12.4 |
7 | 0.00 | 74.0 | 73.7 | 47.20 | 18 | 12.4 |
8 | 0.00 | 73.9 | 73.7 | 47.20 | 18 | 12.4 |
9 | 0.00 | 73.9 | 73.6 | 47.20 | 18 | 12.4 |
10 | 0.00 | 73.8 | 73.5 | 46.60 | 18 | 12.4 |
11 | 0.00 | 73.7 | 73.5 | 47.00 | 18 | 12.4 |
12 | 0.00 | 73.6 | 73.4 | 47.30 | 18 | 12.4 |
13 | 0.00 | 73.5 | 73.3 | 47.30 | 18 | 12.4 |
14 | 0.00 | 73.5 | 73.2 | 47.00 | 18 | 12.4 |
15 | 0.00 | 73.3 | 73.1 | 46.70 | 18 | 12.4 |
16 | 0.00 | 73.2 | 73.0 | 46.90 | 18 | 12.4 |
17 | 0.00 | 73.2 | 73.1 | 47.10 | 18 | 12.4 |
18 | 0.00 | 73.2 | 73.1 | 47.40 | 18 | 12.4 |
19 | 0.00 | 73.6 | 73.4 | 47.60 | 18 | 12.4 |
20 | 0.00 | 73.5 | 73.4 | 61.40 | 18 | 12.4 |
21 | 0.00 | 73.7 | 73.5 | 62.00 | 18 | 12.4 |
22 | 0.00 | 73.7 | 73.5 | 62.00 | 18 | 12.4 |
23 | 0.00 | 73.8 | 73.6 | 61.60 | 18 | 12.4 |
24 | 0.00 | 73.9 | 73.7 | 61.70 | 18 | 12.4 |
|
AVG | 0.00 | 73.8 | 73.5 | 49.98 | 18 | 12.4 |
|
MAX | 0.00 | 74.4 | 74.2 | 62.00 | 18 | 12.4 |
MIN | 0.00 | 73.2 | 73.0 | 45.70 | 18 | 12.4 |
* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock,
PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in
operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through
the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year
indicate the B2CC is open/closed.