HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 210.50 45.90152.20 74.00 18.50 55.50 73.90 75.20 18.50
2 209.30 44.80152.10 73.90 18.30 55.60 73.80 75.00 18.30
3 198.20 33.80152.00 74.00 17.80 56.20 73.90 75.00 17.80
4 196.50 32.00152.10 74.10 17.60 56.50 73.90 75.10 17.70
5 196.70 32.00152.30 74.10 17.60 56.50 74.00 75.10 17.70
6 196.70 32.00152.30 74.10 17.60 56.50 73.90 75.10 17.60
7 196.50 31.90152.20 74.10 17.50 56.60 73.90 75.10 17.50
8 196.40 31.80152.20 74.10 17.50 56.60 74.00 75.10 17.60
9 196.50 31.90152.20 73.90 17.70 56.20 73.70 75.10 17.80
10 205.60 41.10152.10 74.00 17.90 56.10 73.90 75.10 18.00
11 206.50 42.10152.00 73.90 17.90 56.00 73.80 75.10 17.90
12 206.50 42.10152.00 73.90 17.90 56.00 73.60 75.00 17.90
13 206.30 42.00151.90 73.80 18.00 55.80 73.70 75.10 17.90
14 206.50 42.20151.90 74.20 17.90 56.30 74.00 75.20 17.90
15 206.90 42.20152.30 74.30 17.90 56.40 74.10 75.30 17.90
16 209.40 44.60152.40 74.30 17.90 56.40 73.90 75.40 18.00
17 220.70 56.00152.30 74.20 18.30 55.90 74.10 75.50 18.30
18 235.00 70.50152.10 74.00 18.90 55.10 73.90 75.40 19.10
19 237.80 73.30152.10 74.20 19.00 55.20 74.10 75.50 19.10
20 237.50 72.70152.40 74.30 19.20 55.10 74.20 75.70 19.10
21 237.20 72.60152.20 74.40 19.00 55.40 74.30 75.70 19.00
22 234.80 72.50149.90 74.60 19.00 55.60 74.50 75.90 19.10
23 234.20 71.80150.00 74.80 19.10 55.70 74.70 76.00 19.10
24 234.10 71.50150.20 75.00 19.00 56.00 74.90 76.10 19.00
AVG 213.18 48.89151.89 74.17 18.21 55.97 74.03 75.33 18.24
MAX 237.80 73.30152.40 75.00 19.20 56.60 74.90 76.10 19.10
MIN 196.40 31.80149.90 73.80 17.50 55.10 73.60 75.00 17.50

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.0 73.9 45.90 18 12.4
2 0.00 73.9 73.8 44.80 18 12.4
3 0.00 74.0 73.9 33.80 18 12.4
4 0.00 74.1 73.9 32.00 18 12.4
5 0.00 74.1 74.0 32.00 18 12.4
6 0.00 74.1 73.9 32.00 18 12.4
7 0.00 74.1 73.9 31.90 18 12.4
8 0.00 74.1 74.0 31.80 18 12.4
9 0.00 73.9 73.7 31.90 18 12.4
10 0.00 74.0 73.9 41.10 18 12.4
11 0.00 73.9 73.8 42.10 18 12.4
12 0.00 73.9 73.6 42.10 18 12.4
13 0.00 73.8 73.7 42.00 18 12.4
14 0.00 74.2 74.0 42.20 18 12.4
15 0.00 74.3 74.1 42.20 18 12.4
16 0.00 74.3 73.9 44.60 18 12.4
17 0.00 74.2 74.1 56.00 18 12.4
18 0.00 74.0 73.9 70.50 18 12.4
19 0.00 74.2 74.1 73.30 18 12.4
20 0.00 74.3 74.2 72.70 18 12.4
21 0.00 74.4 74.3 72.60 18 12.4
22 0.00 74.6 74.5 72.50 18 12.4
23 0.00 74.8 74.7 71.80 18 12.4
24 0.00 75.0 74.9 71.50 18 12.4
AVG 0.00 74.2 74.0 48.89 18 12.4
MAX 0.00 75.0 74.9 73.30 18 12.4
MIN 0.00 73.8 73.6 31.80 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.