1 101.90 94.50 0.00 75.20 9.80 65.40 75.10 75.40 10.00
2 102.50 95.10 0.00 75.20 9.60 65.60 75.10 75.40 9.80
3 100.90 93.50 0.00 75.20 9.40 65.80 75.00 75.30 9.70
4 100.70 93.30 0.00 74.60 9.70 64.90 74.60 75.20 9.80
5 117.50 110.10 0.00 74.70 10.10 64.60 74.50 75.00 10.30
6 123.00 115.60 0.00 74.60 10.40 64.20 74.40 74.90 10.60
7 125.50 118.10 0.00 74.50 10.40 64.10 74.40 75.00 10.60
8 124.70 116.00 1.30 74.80 10.40 64.40 74.80 75.20 10.50
9 124.50 114.70 2.40 74.90 10.30 64.60 74.80 75.20 10.50
10 125.20 115.40 2.40 75.00 10.40 64.60 74.90 75.30 10.60
11 122.90 113.10 2.40 74.90 10.60 64.30 74.90 75.40 10.70
12 119.40 109.60 2.40 75.20 10.50 64.70 75.00 75.40 10.70
13 114.40 104.60 2.40 75.10 10.40 64.70 75.00 75.40 10.60
14 117.90 108.10 2.40 75.00 10.50 64.50 74.80 75.30 10.70
15 116.20 106.40 2.40 75.00 10.40 64.60 74.90 75.30 10.40
16 116.20 106.40 2.40 75.00 10.36 64.64 74.80 75.30 10.40
17 120.00 110.20 2.40 74.90 10.40 64.50 74.80 75.30 10.40
18 119.40 109.60 2.40 75.00 10.40 64.60 74.80 75.20 10.40
19 118.70 111.30 0.00 75.10 10.20 64.90 75.00 75.30 10.40
20 119.40 112.00 0.00 75.30 10.30 65.00 75.10 75.60 10.40
21 119.60 112.20 0.00 75.30 10.40 64.90 75.20 75.60 10.70
22 116.90 109.50 0.00 75.40 10.60 64.80 75.30 75.70 10.80
23 115.20 107.80 0.00 75.70 10.60 65.10 75.60 75.90 10.90
24 109.20 101.80 0.00 75.70 10.40 65.30 75.60 75.90 10.70
AVG 116.33 107.87 1.05 75.05 10.27 64.78 74.93 75.35 10.44
MAX 125.50 118.10 2.40 75.70 10.60 65.80 75.60 75.90 10.90
MIN 100.70 93.30 0.00 74.50 9.40 64.10 74.40 74.90 9.70

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 7.60 75.2 75.1 86.90 0 7.4
2 7.70 75.2 75.1 87.40 0 7.4
3 7.60 75.2 75.0 85.90 0 7.4
4 7.40 74.6 74.6 85.90 0 7.4
5 14.70 74.7 74.5 95.40 0 7.4
6 19.40 74.6 74.4 96.20 0 7.4
7 19.80 74.5 74.4 98.30 0 7.4
8 19.70 74.8 74.8 96.30 2 7.4
9 18.80 74.9 74.8 95.90 2 7.4
10 19.70 75.0 74.9 95.70 2 7.4
11 22.80 74.9 74.9 90.30 2 7.4
12 24.70 75.2 75.0 84.90 2 7.4
13 17.70 75.1 75.0 86.90 2 7.4
14 18.50 75.0 74.8 89.60 2 7.4
15 17.90 75.0 74.9 88.50 2 7.4
16 18.05 75.0 74.8 88.35 2 7.4
17 18.00 74.9 74.8 92.20 2 7.4
18 17.80 75.0 74.8 91.80 0 7.4
19 19.00 75.1 75.0 92.30 0 7.4
20 19.80 75.3 75.1 92.20 0 7.4
21 19.90 75.3 75.2 92.30 0 7.4
22 18.20 75.4 75.3 91.30 0 7.4
23 17.70 75.7 75.6 90.10 0 7.4
24 17.30 75.7 75.6 84.50 0 7.4
AVG 17.07 75.1 74.9 90.80 1 7.4
MAX 24.70 75.7 75.6 98.30 2 7.4
MIN 7.40 74.5 74.4 84.50 0 7.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.