Hour | Total Outflow kcfs | Generation Flow kcfs | Spill kcfs | PH 1 Forebay Elevation | Tailwater Elevation | Average Head | Project Forebay Elevation | Stevenson Gage Elevation | Project Tailwater Elevation |
---|---|---|---|---|---|---|---|---|---|
1 | 208.50 | 201.10 | 0.00 | 73.00 | 17.90 | 55.10 | 73.60 | 74.80 | 17.20 |
2 | 207.90 | 200.50 | 0.00 | 73.00 | 17.80 | 55.20 | 73.50 | 74.70 | 17.20 |
3 | 208.60 | 201.20 | 0.00 | 72.80 | 17.80 | 55.00 | 73.40 | 74.50 | 17.20 |
4 | 208.50 | 201.10 | 0.00 | 72.80 | 17.80 | 55.00 | 73.30 | 74.40 | 17.20 |
5 | 208.50 | 201.10 | 0.00 | 72.80 | 17.70 | 55.10 | 73.30 | 74.30 | 17.20 |
6 | 188.50 | 181.10 | 0.00 | 73.00 | 16.90 | 56.10 | 73.40 | 74.40 | 16.30 |
7 | 181.80 | 173.80 | 0.60 | 73.30 | 16.60 | 56.70 | 73.60 | 74.40 | 16.10 |
8 | 179.60 | 171.00 | 1.20 | 73.50 | 16.40 | 57.10 | 73.80 | 74.60 | 16.00 |
9 | 171.50 | 162.90 | 1.20 | 73.70 | 16.00 | 57.70 | 74.00 | 74.80 | 15.60 |
10 | 170.20 | 161.60 | 1.20 | 73.80 | 15.90 | 57.90 | 74.10 | 74.90 | 15.50 |
11 | 170.80 | 162.20 | 1.20 | 74.00 | 15.80 | 58.20 | 74.30 | 75.10 | 15.40 |
12 | 170.30 | 161.70 | 1.20 | 74.10 | 15.70 | 58.40 | 74.40 | 75.20 | 15.40 |
13 | 170.90 | 162.30 | 1.20 | 74.20 | 15.60 | 58.60 | 74.20 | 75.10 | 15.30 |
14 | 173.80 | 165.20 | 1.20 | 74.00 | 15.70 | 58.30 | 74.20 | 75.10 | 15.40 |
15 | 177.70 | 169.10 | 1.20 | 74.20 | 15.70 | 58.50 | 74.20 | 75.10 | 15.50 |
16 | 180.30 | 171.70 | 1.20 | 74.00 | 16.10 | 57.90 | 74.10 | 75.10 | 15.70 |
17 | 186.10 | 177.60 | 1.10 | 73.90 | 16.30 | 57.60 | 74.00 | 75.00 | 15.90 |
18 | 200.80 | 193.40 | 0.00 | 73.80 | 17.10 | 56.70 | 74.00 | 75.10 | 16.60 |
19 | 201.90 | 194.50 | 0.00 | 73.80 | 17.20 | 56.60 | 74.00 | 75.00 | 16.70 |
20 | 202.00 | 194.60 | 0.00 | 73.80 | 17.20 | 56.60 | 74.00 | 75.10 | 16.70 |
21 | 201.90 | 194.50 | 0.00 | 73.50 | 17.50 | 56.00 | 73.90 | 75.10 | 16.90 |
22 | 221.10 | 213.70 | 0.00 | 73.20 | 18.30 | 54.90 | 73.50 | 74.90 | 17.70 |
23 | 224.10 | 216.70 | 0.00 | 73.20 | 18.30 | 54.90 | 73.50 | 74.80 | 17.70 |
24 | 223.30 | 215.90 | 0.00 | 73.00 | 18.30 | 54.70 | 73.40 | 74.70 | 17.80 |
AVG | 193.28 | 185.35 | 0.52 | 73.52 | 16.90 | 56.62 | 73.82 | 74.84 | 16.43 |
MAX | 224.10 | 216.70 | 1.20 | 74.20 | 18.30 | 58.60 | 74.40 | 75.20 | 17.80 |
MIN | 170.20 | 161.60 | 0.00 | 72.80 | 15.60 | 54.70 | 73.30 | 74.30 | 15.30 |
Powerhouse 1 | Powerhouse 2 | Project | ||||
---|---|---|---|---|---|---|
Hour | Generation Flow kcfs | Forebay Elevation | Forebay Elevation | Generation Flow kcfs | Spillway Gates in Use | Miscellaneous Flow kcfs* |
1 | 128.70 | 73.0 | 73.6 | 72.40 | 0 | 7.4 |
2 | 128.50 | 73.0 | 73.5 | 72.00 | 0 | 7.4 |
3 | 128.40 | 72.8 | 73.4 | 72.80 | 0 | 7.4 |
4 | 128.30 | 72.8 | 73.3 | 72.80 | 0 | 7.4 |
5 | 128.60 | 72.8 | 73.3 | 72.50 | 0 | 7.4 |
6 | 121.50 | 73.0 | 73.4 | 59.60 | 0 | 7.4 |
7 | 115.10 | 73.3 | 73.6 | 58.70 | 1 | 7.4 |
8 | 113.20 | 73.5 | 73.8 | 57.80 | 1 | 7.4 |
9 | 107.40 | 73.7 | 74.0 | 55.50 | 1 | 7.4 |
10 | 106.20 | 73.8 | 74.1 | 55.40 | 1 | 7.4 |
11 | 106.80 | 74.0 | 74.3 | 55.40 | 1 | 7.4 |
12 | 106.70 | 74.1 | 74.4 | 55.00 | 1 | 7.4 |
13 | 101.90 | 74.2 | 74.2 | 60.40 | 1 | 7.4 |
14 | 91.40 | 74.0 | 74.2 | 73.80 | 1 | 7.4 |
15 | 84.40 | 74.2 | 74.2 | 84.70 | 1 | 7.4 |
16 | 85.00 | 74.0 | 74.1 | 86.70 | 1 | 7.4 |
17 | 90.80 | 73.9 | 74.0 | 86.80 | 1 | 7.4 |
18 | 102.80 | 73.8 | 74.0 | 90.60 | 0 | 7.4 |
19 | 103.40 | 73.8 | 74.0 | 91.10 | 0 | 7.4 |
20 | 103.40 | 73.8 | 74.0 | 91.20 | 0 | 7.4 |
21 | 103.00 | 73.5 | 73.9 | 91.50 | 0 | 7.4 |
22 | 113.30 | 73.2 | 73.5 | 100.40 | 0 | 7.4 |
23 | 115.00 | 73.2 | 73.5 | 101.70 | 0 | 7.4 |
24 | 114.30 | 73.0 | 73.4 | 101.60 | 0 | 7.4 |
AVG | 109.50 | 73.5 | 73.8 | 75.85 | 0 | 7.4 |
MAX | 128.70 | 74.2 | 74.4 | 101.70 | 1 | 7.4 |
MIN | 84.40 | 72.8 | 73.3 | 55.00 | 0 | 7.4 |
* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.