US Army Corps of Engineers

Bonneville Dam

Tuesday April 20, 2021

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 142.50 31.10 99.00 74.80 12.00 62.80 74.60 75.30 12.10
2 142.60 31.20 99.00 74.90 12.10 62.80 74.60 75.30 12.20
3 142.40 30.90 99.10 74.80 12.10 62.70 74.60 75.30 12.20
4 142.40 30.90 99.10 74.80 12.20 62.60 74.60 75.30 12.40
5 142.40 31.00 99.00 74.80 12.10 62.70 74.50 75.30 12.30
6 142.70 31.30 99.00 74.80 12.10 62.70 74.60 75.20 12.30
7 142.50 31.10 99.00 74.80 12.20 62.60 74.50 75.20 12.30
8 143.00 31.60 99.00 74.90 12.30 62.60 74.60 75.30 12.30
9 143.20 31.70 99.10 74.90 12.20 62.70 74.60 75.30 12.30
10 143.10 31.60 99.10 75.00 12.10 62.90 74.70 75.40 12.20
11 143.10 31.70 99.00 74.80 12.10 62.70 74.60 75.40 12.30
12 143.40 32.00 99.00 74.90 12.20 62.70 74.70 75.40 12.40
13 144.10 31.80 99.90 74.90 12.40 62.50 74.70 75.40 12.50
14 145.80 31.60101.80 74.80 12.40 62.40 74.70 75.40 12.60
15 146.30 31.80102.10 74.80 12.40 62.40 74.70 75.40 12.60
16 146.70 31.80102.50 74.80 12.60 62.20 74.60 75.30 12.70
17 146.80 31.90102.50 74.80 12.60 62.20 74.60 75.30 12.70
18 146.70 31.80102.50 74.80 12.60 62.20 74.60 75.30 12.70
19 146.90 31.90102.60 74.80 12.60 62.20 74.60 75.40 12.70
20 147.30 32.30102.60 74.90 12.50 62.40 74.70 75.40 12.70
21 147.50 32.30102.80 74.90 12.50 62.40 74.70 75.40 12.70
22 147.40 32.20102.80 74.90 12.50 62.40 74.70 75.50 12.60
23 146.90 31.60102.90 74.90 12.40 62.50 74.70 75.50 12.50
24 146.70 31.40102.90 75.00 12.40 62.60 74.80 75.50 12.50
AVG 144.68 31.60100.68 74.85 12.32 62.54 74.64 75.35 12.45
MAX 147.50 32.30102.90 75.00 12.60 62.90 74.80 75.50 12.70
MIN 142.40 30.90 99.00 74.80 12.00 62.20 74.50 75.20 12.10

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.8 74.6 31.10 18 12.4
2 0.00 74.9 74.6 31.20 18 12.4
3 0.00 74.8 74.6 30.90 18 12.4
4 0.00 74.8 74.6 30.90 18 12.4
5 0.00 74.8 74.5 31.00 18 12.4
6 0.00 74.8 74.6 31.30 18 12.4
7 0.00 74.8 74.5 31.10 18 12.4
8 0.00 74.9 74.6 31.60 18 12.4
9 0.00 74.9 74.6 31.70 18 12.4
10 0.00 75.0 74.7 31.60 18 12.4
11 0.00 74.8 74.6 31.70 18 12.4
12 0.00 74.9 74.7 32.00 18 12.4
13 0.00 74.9 74.7 31.80 18 12.4
14 0.00 74.8 74.7 31.60 18 12.4
15 0.00 74.8 74.7 31.80 18 12.4
16 0.00 74.8 74.6 31.80 18 12.4
17 0.00 74.8 74.6 31.90 18 12.4
18 0.00 74.8 74.6 31.80 18 12.4
19 0.00 74.8 74.6 31.90 18 12.4
20 0.00 74.9 74.7 32.30 18 12.4
21 0.00 74.9 74.7 32.30 18 12.4
22 0.00 74.9 74.7 32.20 18 12.4
23 0.00 74.9 74.7 31.60 18 12.4
24 0.00 75.0 74.8 31.40 18 12.4
AVG 0.00 74.9 74.6 31.60 18 12.4
MAX 0.00 75.0 74.8 32.30 18 12.4
MIN 0.00 74.8 74.5 30.90 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.