US Army Corps of Engineers

Bonneville Dam

Saturday April 26, 2025

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 207.20 44.90149.90 73.60 17.40 56.20 73.40 74.70 17.30
2 206.90 44.50150.00 73.60 17.50 56.10 73.40 74.80 17.40
3 207.20 44.70150.10 73.60 17.40 56.20 73.50 74.80 17.10
4 207.50 44.90150.20 73.60 17.30 56.30 73.40 74.80 17.30
5 207.30 44.70150.20 73.70 17.40 56.30 73.50 74.80 17.20
6 206.20 43.50150.30 73.70 17.40 56.30 73.50 74.90 17.20
7 206.50 43.80150.30 73.70 17.50 56.20 73.60 74.90 17.40
8 206.30 43.60150.30 73.80 17.60 56.20 73.60 74.90 17.60
9 207.60 44.90150.30 73.70 17.60 56.10 73.50 74.90 17.50
10 207.70 45.00150.30 73.60 17.70 55.90 73.40 74.80 17.50
11 207.10 44.80149.90 73.40 17.60 55.80 73.20 74.60 17.50
12 207.00 44.90149.70 73.30 17.80 55.50 73.10 74.50 17.40
13 206.30 44.30149.60 73.20 17.60 55.60 73.00 74.50 17.40
14 206.50 44.70149.40 73.10 17.50 55.60 73.00 74.30 17.30
15 206.50 44.90149.20 73.00 17.50 55.50 72.80 74.30 17.30
16 205.90 44.40149.10 72.90 17.40 55.50 72.90 74.20 17.30
17 194.80 33.10149.30 73.10 16.90 56.20 72.90 74.20 16.80
18 194.90 33.20149.30 73.10 16.80 56.30 72.90 74.20 16.70
19 194.80 33.10149.30 73.20 17.00 56.20 73.10 74.30 16.80
20 195.20 33.30149.50 73.30 17.00 56.30 73.10 74.40 16.80
21 195.30 33.20149.70 73.40 17.00 56.40 73.20 74.50 16.80
22 195.50 33.20149.90 73.50 17.00 56.50 73.40 74.60 16.80
23 195.50 33.00150.10 73.60 17.00 56.60 73.50 74.70 16.80
24 195.80 33.20150.20 73.80 17.00 56.80 73.60 74.80 16.80
AVG 202.98 40.74149.84 73.44 17.33 56.11 73.27 74.60 17.17
MAX 207.70 45.00150.30 73.80 17.80 56.80 73.60 74.90 17.60
MIN 194.80 33.00149.10 72.90 16.80 55.50 72.80 74.20 16.70

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 73.6 73.4 44.90 18 12.4
2 0.00 73.6 73.4 44.50 18 12.4
3 0.00 73.6 73.5 44.70 18 12.4
4 0.00 73.6 73.4 44.90 18 12.4
5 0.00 73.7 73.5 44.70 18 12.4
6 0.00 73.7 73.5 43.50 18 12.4
7 0.00 73.7 73.6 43.80 18 12.4
8 0.00 73.8 73.6 43.60 18 12.4
9 0.00 73.7 73.5 44.90 18 12.4
10 0.00 73.6 73.4 45.00 18 12.4
11 0.00 73.4 73.2 44.80 18 12.4
12 0.00 73.3 73.1 44.90 18 12.4
13 0.00 73.2 73.0 44.30 18 12.4
14 0.00 73.1 73.0 44.70 18 12.4
15 0.00 73.0 72.8 44.90 18 12.4
16 0.00 72.9 72.9 44.40 18 12.4
17 0.00 73.1 72.9 33.10 18 12.4
18 0.00 73.1 72.9 33.20 18 12.4
19 0.00 73.2 73.1 33.10 18 12.4
20 0.00 73.3 73.1 33.30 18 12.4
21 0.00 73.4 73.2 33.20 18 12.4
22 0.00 73.5 73.4 33.20 18 12.4
23 0.00 73.6 73.5 33.00 18 12.4
24 0.00 73.8 73.6 33.20 18 12.4
AVG 0.00 73.4 73.3 40.74 18 12.4
MAX 0.00 73.8 73.6 45.00 18 12.4
MIN 0.00 72.9 72.8 33.00 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.