Bonneville Dam
Saturday April 26, 2025
Hour | Total Outflow kcfs | Generation Flow kcfs | Spill kcfs | PH 1 Forebay Elevation | Tailwater Elevation | Average Head | Project Forebay Elevation | Stevenson Gage Elevation | Project Tailwater Elevation |
1 | 207.20 | 44.90 | 149.90 | 73.60 | 17.40 | 56.20 | 73.40 | 74.70 | 17.30 |
2 | 206.90 | 44.50 | 150.00 | 73.60 | 17.50 | 56.10 | 73.40 | 74.80 | 17.40 |
3 | 207.20 | 44.70 | 150.10 | 73.60 | 17.40 | 56.20 | 73.50 | 74.80 | 17.10 |
4 | 207.50 | 44.90 | 150.20 | 73.60 | 17.30 | 56.30 | 73.40 | 74.80 | 17.30 |
5 | 207.30 | 44.70 | 150.20 | 73.70 | 17.40 | 56.30 | 73.50 | 74.80 | 17.20 |
6 | 206.20 | 43.50 | 150.30 | 73.70 | 17.40 | 56.30 | 73.50 | 74.90 | 17.20 |
7 | 206.50 | 43.80 | 150.30 | 73.70 | 17.50 | 56.20 | 73.60 | 74.90 | 17.40 |
8 | 206.30 | 43.60 | 150.30 | 73.80 | 17.60 | 56.20 | 73.60 | 74.90 | 17.60 |
9 | 207.60 | 44.90 | 150.30 | 73.70 | 17.60 | 56.10 | 73.50 | 74.90 | 17.50 |
10 | 207.70 | 45.00 | 150.30 | 73.60 | 17.70 | 55.90 | 73.40 | 74.80 | 17.50 |
11 | 207.10 | 44.80 | 149.90 | 73.40 | 17.60 | 55.80 | 73.20 | 74.60 | 17.50 |
12 | 207.00 | 44.90 | 149.70 | 73.30 | 17.80 | 55.50 | 73.10 | 74.50 | 17.40 |
13 | 206.30 | 44.30 | 149.60 | 73.20 | 17.60 | 55.60 | 73.00 | 74.50 | 17.40 |
14 | 206.50 | 44.70 | 149.40 | 73.10 | 17.50 | 55.60 | 73.00 | 74.30 | 17.30 |
15 | 206.50 | 44.90 | 149.20 | 73.00 | 17.50 | 55.50 | 72.80 | 74.30 | 17.30 |
16 | 205.90 | 44.40 | 149.10 | 72.90 | 17.40 | 55.50 | 72.90 | 74.20 | 17.30 |
17 | 194.80 | 33.10 | 149.30 | 73.10 | 16.90 | 56.20 | 72.90 | 74.20 | 16.80 |
18 | 194.90 | 33.20 | 149.30 | 73.10 | 16.80 | 56.30 | 72.90 | 74.20 | 16.70 |
19 | 194.80 | 33.10 | 149.30 | 73.20 | 17.00 | 56.20 | 73.10 | 74.30 | 16.80 |
20 | 195.20 | 33.30 | 149.50 | 73.30 | 17.00 | 56.30 | 73.10 | 74.40 | 16.80 |
21 | 195.30 | 33.20 | 149.70 | 73.40 | 17.00 | 56.40 | 73.20 | 74.50 | 16.80 |
22 | 195.50 | 33.20 | 149.90 | 73.50 | 17.00 | 56.50 | 73.40 | 74.60 | 16.80 |
23 | 195.50 | 33.00 | 150.10 | 73.60 | 17.00 | 56.60 | 73.50 | 74.70 | 16.80 |
24 | 195.80 | 33.20 | 150.20 | 73.80 | 17.00 | 56.80 | 73.60 | 74.80 | 16.80 |
|
AVG | 202.98 | 40.74 | 149.84 | 73.44 | 17.33 | 56.11 | 73.27 | 74.60 | 17.17 |
|
MAX | 207.70 | 45.00 | 150.30 | 73.80 | 17.80 | 56.80 | 73.60 | 74.90 | 17.60 |
MIN | 194.80 | 33.00 | 149.10 | 72.90 | 16.80 | 55.50 | 72.80 | 74.20 | 16.70 |
|
Powerhouse 1 |
Powerhouse 2 |
Project |
Hour | Generation Flow kcfs | Forebay Elevation | Forebay Elevation | Generation Flow kcfs | Spillway Gates in Use | Miscellaneous Flow kcfs* |
1 | 0.00 | 73.6 | 73.4 | 44.90 | 18 | 12.4 |
2 | 0.00 | 73.6 | 73.4 | 44.50 | 18 | 12.4 |
3 | 0.00 | 73.6 | 73.5 | 44.70 | 18 | 12.4 |
4 | 0.00 | 73.6 | 73.4 | 44.90 | 18 | 12.4 |
5 | 0.00 | 73.7 | 73.5 | 44.70 | 18 | 12.4 |
6 | 0.00 | 73.7 | 73.5 | 43.50 | 18 | 12.4 |
7 | 0.00 | 73.7 | 73.6 | 43.80 | 18 | 12.4 |
8 | 0.00 | 73.8 | 73.6 | 43.60 | 18 | 12.4 |
9 | 0.00 | 73.7 | 73.5 | 44.90 | 18 | 12.4 |
10 | 0.00 | 73.6 | 73.4 | 45.00 | 18 | 12.4 |
11 | 0.00 | 73.4 | 73.2 | 44.80 | 18 | 12.4 |
12 | 0.00 | 73.3 | 73.1 | 44.90 | 18 | 12.4 |
13 | 0.00 | 73.2 | 73.0 | 44.30 | 18 | 12.4 |
14 | 0.00 | 73.1 | 73.0 | 44.70 | 18 | 12.4 |
15 | 0.00 | 73.0 | 72.8 | 44.90 | 18 | 12.4 |
16 | 0.00 | 72.9 | 72.9 | 44.40 | 18 | 12.4 |
17 | 0.00 | 73.1 | 72.9 | 33.10 | 18 | 12.4 |
18 | 0.00 | 73.1 | 72.9 | 33.20 | 18 | 12.4 |
19 | 0.00 | 73.2 | 73.1 | 33.10 | 18 | 12.4 |
20 | 0.00 | 73.3 | 73.1 | 33.30 | 18 | 12.4 |
21 | 0.00 | 73.4 | 73.2 | 33.20 | 18 | 12.4 |
22 | 0.00 | 73.5 | 73.4 | 33.20 | 18 | 12.4 |
23 | 0.00 | 73.6 | 73.5 | 33.00 | 18 | 12.4 |
24 | 0.00 | 73.8 | 73.6 | 33.20 | 18 | 12.4 |
|
AVG | 0.00 | 73.4 | 73.3 | 40.74 | 18 | 12.4 |
|
MAX | 0.00 | 73.8 | 73.6 | 45.00 | 18 | 12.4 |
MIN | 0.00 | 72.9 | 72.8 | 33.00 | 18 | 12.4 |
* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock,
PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in
operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through
the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year
indicate the B2CC is open/closed.