US Army Corps of Engineers

Bonneville Dam

Sunday May 15, 2022

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 252.30 91.00148.90 75.40 20.60 54.80 75.20 76.70 20.60
2 251.50 90.30148.80 75.30 20.60 54.70 75.10 76.60 20.60
3 251.60 90.60148.60 75.20 20.60 54.60 75.00 76.60 20.50
4 251.00 89.90148.70 75.30 20.50 54.80 75.00 76.00 20.40
5 251.20 90.10148.70 75.20 20.50 54.70 75.00 76.50 20.40
6 251.40 90.40148.60 75.20 20.50 54.70 75.00 76.50 20.40
7 250.80 89.70148.70 75.20 20.50 54.70 74.90 76.50 20.50
8 250.40 89.30148.70 75.10 20.60 54.50 74.90 76.40 20.40
9 251.10 90.00148.70 75.20 20.60 54.60 74.90 76.40 20.50
10 251.50 90.30148.80 75.20 20.60 54.60 75.00 76.50 20.60
11 252.30 91.00148.90 75.30 20.60 54.70 75.10 76.50 20.60
12 252.40 91.00149.00 75.20 20.70 54.50 75.00 76.50 20.60
13 252.40 91.00149.00 75.20 20.70 54.50 75.00 76.50 20.60
14 252.40 91.00149.00 75.20 20.60 54.60 75.00 76.50 20.60
15 251.70 90.40148.90 75.20 20.60 54.60 75.00 76.50 20.50
16 261.10 99.90148.80 75.00 21.10 53.90 74.90 76.50 20.90
17 261.90 100.70148.80 75.00 21.00 54.00 74.80 76.50 20.90
18 262.00 100.80148.80 74.70 21.40 53.30 74.70 76.50 21.10
19 274.50 113.40148.70 74.60 21.70 52.90 74.50 76.50 21.40
20 281.10 120.10148.60 74.60 21.80 52.80 74.40 76.20 21.60
21 282.40 121.30148.70 74.70 22.00 52.70 74.50 76.30 21.70
22 281.30 119.90149.00 75.00 21.60 53.40 74.90 76.40 21.40
23 259.30 97.80149.10 75.20 21.00 54.20 75.00 76.50 21.10
24 238.20 76.80149.00 75.30 20.30 55.00 75.10 76.50 20.30
AVG 257.32 96.11148.81 75.10 20.86 54.24 74.91 76.46 20.76
MAX 282.40 121.30149.10 75.40 22.00 55.00 75.20 76.70 21.70
MIN 238.20 76.80148.60 74.60 20.30 52.70 74.40 76.00 20.30

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 9.40 75.4 75.2 81.60 18 12.4
2 8.70 75.3 75.1 81.60 18 12.4
3 8.70 75.2 75.0 81.90 18 12.4
4 8.60 75.3 75.0 81.30 18 12.4
5 8.70 75.2 75.0 81.40 18 12.4
6 8.70 75.2 75.0 81.70 18 12.4
7 8.60 75.2 74.9 81.10 18 12.4
8 8.60 75.1 74.9 80.70 18 12.4
9 8.60 75.2 74.9 81.40 18 12.4
10 8.60 75.2 75.0 81.70 18 12.4
11 8.70 75.3 75.1 82.30 18 12.4
12 8.70 75.2 75.0 82.30 18 12.4
13 8.70 75.2 75.0 82.30 18 12.4
14 8.70 75.2 75.0 82.30 18 12.4
15 8.80 75.2 75.0 81.60 18 12.4
16 9.90 75.0 74.9 90.00 18 12.4
17 10.60 75.0 74.8 90.10 18 12.4
18 10.50 74.7 74.7 90.30 18 12.4
19 27.40 74.6 74.5 86.00 18 12.4
20 30.20 74.6 74.4 89.90 18 12.4
21 30.50 74.7 74.5 90.80 18 12.4
22 29.70 75.0 74.9 90.20 18 12.4
23 15.30 75.2 75.0 82.50 18 12.4
24 0.90 75.3 75.1 75.90 18 12.4
AVG 12.33 75.1 74.9 83.79 18 12.4
MAX 30.50 75.4 75.2 90.80 18 12.4
MIN 0.90 74.6 74.4 75.90 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.