Hour | Total Outflow kcfs | Generation Flow kcfs | Spill kcfs | PH 1 Forebay Elevation | Tailwater Elevation | Average Head | Project Forebay Elevation | Stevenson Gage Elevation | Project Tailwater Elevation |
1 | 280.70 | 118.20 | 150.10 | 74.50 | 21.40 | 53.10 | 74.30 | 76.10 | 21.30 |
2 | 273.80 | 111.40 | 150.00 | 74.40 | 21.30 | 53.10 | 74.20 | 76.00 | 21.10 |
3 | 272.70 | 110.30 | 150.00 | 74.50 | 21.20 | 53.30 | 74.30 | 76.00 | 21.10 |
4 | 273.00 | 110.60 | 150.00 | 74.50 | 21.20 | 53.30 | 74.30 | 76.00 | 21.00 |
5 | 274.90 | 112.60 | 149.90 | 74.40 | 21.30 | 53.10 | 74.20 | 76.00 | 21.10 |
6 | 284.60 | 122.50 | 149.70 | 74.10 | 21.80 | 52.30 | 73.90 | 75.90 | 21.60 |
7 | 288.50 | 126.40 | 149.70 | 74.10 | 21.80 | 52.30 | 74.00 | 75.80 | 21.60 |
8 | 285.00 | 122.60 | 150.00 | 74.20 | 21.80 | 52.40 | 74.10 | 75.90 | 21.60 |
9 | 284.40 | 122.00 | 150.00 | 74.00 | 22.00 | 52.00 | 73.80 | 75.90 | 21.70 |
10 | 302.30 | 140.30 | 149.60 | 73.80 | 22.40 | 51.40 | 73.60 | 75.80 | 22.10 |
11 | 306.80 | 144.90 | 149.50 | 73.60 | 22.70 | 50.90 | 73.50 | 75.70 | 22.30 |
12 | 307.90 | 146.30 | 149.20 | 73.60 | 22.80 | 50.80 | 73.50 | 75.70 | 22.40 |
13 | 305.70 | 144.20 | 149.10 | 73.50 | 22.70 | 50.80 | 73.50 | 75.60 | 22.30 |
14 | 303.20 | 141.90 | 148.90 | 73.50 | 22.40 | 51.10 | 73.40 | 75.50 | 22.10 |
15 | 271.40 | 109.80 | 149.20 | 74.00 | 21.30 | 52.70 | 73.80 | 75.60 | 22.20 |
16 | 270.60 | 109.10 | 149.10 | 73.90 | 21.30 | 52.60 | 73.80 | 75.60 | 21.30 |
17 | 271.30 | 109.80 | 149.10 | 73.80 | 21.40 | 52.40 | 73.70 | 75.60 | 21.20 |
18 | 281.90 | 120.60 | 148.90 | 73.60 | 21.80 | 51.80 | 73.50 | 75.40 | 21.60 |
19 | 283.70 | 122.10 | 149.20 | 73.60 | 21.70 | 51.90 | 73.50 | 75.40 | 21.50 |
20 | 281.20 | 119.50 | 149.30 | 73.70 | 21.70 | 52.00 | 73.60 | 75.50 | 21.50 |
21 | 282.90 | 121.20 | 149.30 | 73.70 | 21.70 | 52.00 | 73.60 | 75.50 | 21.50 |
22 | 283.70 | 122.00 | 149.30 | 73.60 | 21.70 | 51.90 | 73.50 | 75.40 | 21.50 |
23 | 290.40 | 128.80 | 149.20 | 73.40 | 22.10 | 51.30 | 73.30 | 75.40 | 21.70 |
24 | 286.70 | 124.90 | 149.40 | 73.70 | 21.70 | 52.00 | 73.60 | 75.50 | 21.50 |
|
AVG | 285.30 | 123.42 | 149.49 | 73.90 | 21.80 | 52.10 | 73.77 | 75.70 | 21.62 |
|
MAX | 307.90 | 146.30 | 150.10 | 74.50 | 22.80 | 53.30 | 74.30 | 76.10 | 22.40 |
MIN | 270.60 | 109.10 | 148.90 | 73.40 | 21.20 | 50.80 | 73.30 | 75.40 | 21.00 |
|
Powerhouse 1 |
Powerhouse 2 |
Project |
Hour | Generation Flow kcfs | Forebay Elevation | Forebay Elevation | Generation Flow kcfs | Spillway Gates in Use | Miscellaneous Flow kcfs* |
1 | 35.90 | 74.5 | 74.3 | 82.30 | 18 | 12.4 |
2 | 29.50 | 74.4 | 74.2 | 81.90 | 18 | 12.4 |
3 | 29.20 | 74.5 | 74.3 | 81.10 | 18 | 12.4 |
4 | 29.30 | 74.5 | 74.3 | 81.30 | 18 | 12.4 |
5 | 29.80 | 74.4 | 74.2 | 82.80 | 18 | 12.4 |
6 | 40.50 | 74.1 | 73.9 | 82.00 | 18 | 12.4 |
7 | 44.50 | 74.1 | 74.0 | 81.90 | 18 | 12.4 |
8 | 41.00 | 74.2 | 74.1 | 81.60 | 18 | 12.4 |
9 | 41.10 | 74.0 | 73.8 | 80.90 | 18 | 12.4 |
10 | 65.10 | 73.8 | 73.6 | 75.20 | 18 | 12.4 |
11 | 65.40 | 73.6 | 73.5 | 79.50 | 18 | 12.4 |
12 | 63.70 | 73.6 | 73.5 | 82.60 | 18 | 12.4 |
13 | 61.90 | 73.5 | 73.5 | 82.30 | 18 | 12.4 |
14 | 59.90 | 73.5 | 73.4 | 82.00 | 18 | 12.4 |
15 | 31.60 | 74.0 | 73.8 | 78.20 | 18 | 12.4 |
16 | 27.40 | 73.9 | 73.8 | 81.70 | 18 | 12.4 |
17 | 27.70 | 73.8 | 73.7 | 82.10 | 18 | 12.4 |
18 | 35.80 | 73.6 | 73.5 | 84.80 | 18 | 12.4 |
19 | 38.70 | 73.6 | 73.5 | 83.40 | 18 | 12.4 |
20 | 38.40 | 73.7 | 73.6 | 81.10 | 18 | 12.4 |
21 | 38.70 | 73.7 | 73.6 | 82.50 | 18 | 12.4 |
22 | 38.80 | 73.6 | 73.5 | 83.20 | 18 | 12.4 |
23 | 44.10 | 73.4 | 73.3 | 84.70 | 18 | 12.4 |
24 | 43.30 | 73.7 | 73.6 | 81.60 | 18 | 12.4 |
|
AVG | 41.72 | 73.9 | 73.8 | 81.70 | 18 | 12.4 |
|
MAX | 65.40 | 74.5 | 74.3 | 84.80 | 18 | 12.4 |
MIN | 27.40 | 73.4 | 73.3 | 75.20 | 18 | 12.4 |
* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock,
PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in
operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through
the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year
indicate the B2CC is open/closed.