US Army Corps of Engineers

Bonneville Dam

Tuesday May 7, 2024

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 145.30 33.80 99.10 73.30 13.90 59.40 73.20 74.00 14.00
2 145.10 33.80 98.90 73.30 13.80 59.50 73.10 73.90 13.90
3 145.00 33.80 98.80 73.20 13.80 59.40 73.00 73.80 13.80
4 144.80 33.70 98.70 73.10 13.80 59.30 72.90 73.70 13.80
5 144.90 33.80 98.70 73.00 13.70 59.30 72.80 73.60 13.70
6 144.70 33.80 98.50 72.90 14.20 58.70 72.80 73.50 13.90
7 144.60 33.70 98.50 73.10 14.00 59.10 72.90 73.60 14.10
8 145.00 33.80 98.80 73.30 14.30 59.00 73.10 73.50 14.40
9 145.00 33.70 98.90 73.40 14.20 59.20 73.20 73.90 14.40
10 145.10 33.70 99.00 73.40 14.20 59.20 73.30 74.00 14.40
11 146.10 33.80 99.90 73.50 14.20 59.30 73.20 74.00 14.40
12 159.80 33.70113.70 73.40 14.90 58.50 73.20 74.00 14.90
13 159.30 33.50113.40 73.10 14.70 58.40 72.90 73.90 14.90
14 159.30 33.60113.30 73.10 14.80 58.30 72.90 73.80 14.80
15 159.20 33.60113.20 73.10 14.80 58.30 72.70 73.60 14.80
16 159.10 33.60113.10 72.80 14.60 58.20 72.70 73.50 14.70
17 159.20 33.90112.90 72.60 14.60 58.00 72.50 73.50 14.70
18 158.90 33.70112.80 72.60 14.60 58.00 72.40 73.30 14.60
19 158.90 33.80112.70 72.50 14.60 57.90 72.40 73.20 14.60
20 158.90 33.80112.70 72.80 14.80 58.00 72.60 73.30 14.70
21 159.40 33.90113.10 72.90 14.80 58.10 72.70 73.50 14.80
22 159.40 33.80113.20 73.00 14.80 58.20 72.80 73.60 14.90
23 159.40 33.70113.30 73.00 14.80 58.20 72.80 73.70 14.90
24 159.60 33.80113.40 73.10 14.80 58.30 72.90 73.80 14.90
AVG 152.75 33.74106.61 73.06 14.40 58.66 72.88 73.67 14.46
MAX 159.80 33.90113.70 73.50 14.90 59.50 73.30 74.00 14.90
MIN 144.60 33.50 98.50 72.50 13.70 57.90 72.40 73.20 13.70

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 73.3 73.2 33.80 18 12.4
2 0.00 73.3 73.1 33.80 18 12.4
3 0.00 73.2 73.0 33.80 18 12.4
4 0.00 73.1 72.9 33.70 18 12.4
5 0.00 73.0 72.8 33.80 18 12.4
6 0.39 72.9 72.8 33.41 18 12.4
7 0.00 73.1 72.9 33.70 18 12.4
8 0.00 73.3 73.1 33.80 18 12.4
9 0.00 73.4 73.2 33.70 18 12.4
10 0.00 73.4 73.3 33.70 18 12.4
11 0.00 73.5 73.2 33.80 18 12.4
12 0.00 73.4 73.2 33.70 18 12.4
13 0.00 73.1 72.9 33.50 18 12.4
14 0.00 73.1 72.9 33.60 18 12.4
15 0.00 73.1 72.7 33.60 18 12.4
16 0.00 72.8 72.7 33.60 18 12.4
17 0.00 72.6 72.5 33.90 18 12.4
18 0.00 72.6 72.4 33.70 18 12.4
19 0.00 72.5 72.4 33.80 18 12.4
20 0.00 72.8 72.6 33.80 18 12.4
21 0.00 72.9 72.7 33.90 18 12.4
22 0.00 73.0 72.8 33.80 18 12.4
23 0.00 73.0 72.8 33.70 18 12.4
24 0.00 73.1 72.9 33.80 18 12.4
AVG 0.02 73.1 72.9 33.73 18 12.4
MAX 0.39 73.5 73.3 33.90 18 12.4
MIN 0.00 72.5 72.4 33.41 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.