Hour | Total Outflow kcfs | Generation Flow kcfs | Spill kcfs | PH 1 Forebay Elevation | Tailwater Elevation | Average Head | Project Forebay Elevation | Stevenson Gage Elevation | Project Tailwater Elevation |
1 | 197.00 | 89.00 | 95.60 | 74.20 | 16.20 | 58.00 | 74.00 | 75.00 | 16.20 |
2 | 196.80 | 88.80 | 95.60 | 74.30 | 15.90 | 58.40 | 74.00 | 74.90 | 16.00 |
3 | 179.60 | 71.60 | 95.60 | 74.10 | 15.40 | 58.70 | 74.00 | 74.90 | 15.50 |
4 | 177.90 | 69.90 | 95.60 | 74.10 | 15.10 | 59.00 | 73.90 | 74.80 | 15.20 |
5 | 166.70 | 58.70 | 95.60 | 74.20 | 14.60 | 59.60 | 74.00 | 74.80 | 14.70 |
6 | 166.00 | 58.00 | 95.60 | 74.10 | 14.60 | 59.50 | 74.00 | 74.80 | 14.70 |
7 | 166.40 | 58.40 | 95.60 | 74.10 | 14.60 | 59.50 | 74.00 | 74.80 | 14.70 |
8 | 166.20 | 58.30 | 95.50 | 74.10 | 14.60 | 59.50 | 73.90 | 74.80 | 14.70 |
9 | 166.20 | 58.30 | 95.50 | 74.10 | 14.60 | 59.50 | 74.00 | 74.80 | 14.70 |
10 | 166.20 | 58.40 | 95.40 | 74.10 | 14.60 | 59.50 | 73.90 | 74.80 | 14.70 |
11 | 166.40 | 58.70 | 95.30 | 74.10 | 14.60 | 59.50 | 73.90 | 74.70 | 14.60 |
12 | 165.90 | 58.20 | 95.30 | 74.10 | 14.50 | 59.60 | 73.90 | 74.70 | 14.50 |
13 | 165.90 | 58.30 | 95.20 | 74.00 | 14.40 | 59.60 | 73.90 | 74.70 | 14.70 |
14 | 165.80 | 58.20 | 95.20 | 73.90 | 14.40 | 59.50 | 73.80 | 74.70 | 14.50 |
15 | 166.10 | 58.50 | 95.20 | 73.80 | 14.30 | 59.50 | 73.80 | 74.60 | 14.40 |
16 | 177.40 | 70.00 | 95.00 | 73.70 | 14.70 | 59.00 | 73.60 | 74.60 | 14.90 |
17 | 178.90 | 71.60 | 94.90 | 73.60 | 14.80 | 58.80 | 73.60 | 74.50 | 14.80 |
18 | 178.60 | 71.40 | 94.80 | 73.90 | 14.60 | 59.30 | 73.80 | 74.60 | 14.80 |
19 | 185.00 | 77.50 | 95.10 | 74.20 | 15.00 | 59.20 | 74.00 | 74.90 | 15.10 |
20 | 191.30 | 83.60 | 95.30 | 74.30 | 15.40 | 58.90 | 74.20 | 75.10 | 15.40 |
21 | 179.80 | 71.60 | 95.80 | 74.90 | 14.90 | 60.00 | 74.80 | 75.50 | 14.90 |
22 | 179.90 | 71.30 | 96.20 | 75.10 | 14.80 | 60.30 | 74.90 | 75.80 | 15.00 |
23 | 180.00 | 71.20 | 96.40 | 75.00 | 14.90 | 60.10 | 74.90 | 75.80 | 15.00 |
24 | 178.30 | 69.50 | 96.40 | 75.00 | 14.80 | 60.20 | 74.90 | 75.80 | 14.90 |
|
AVG | 175.35 | 67.46 | 95.49 | 74.21 | 14.85 | 59.36 | 74.07 | 74.93 | 14.94 |
|
MAX | 197.00 | 89.00 | 96.40 | 75.10 | 16.20 | 60.30 | 74.90 | 75.80 | 16.20 |
MIN | 165.80 | 58.00 | 94.80 | 73.60 | 14.30 | 58.00 | 73.60 | 74.50 | 14.40 |
|
Powerhouse 1 |
Powerhouse 2 |
Project |
Hour | Generation Flow kcfs | Forebay Elevation | Forebay Elevation | Generation Flow kcfs | Spillway Gates in Use | Miscellaneous Flow kcfs* |
1 | 7.80 | 74.2 | 74.0 | 81.20 | 18 | 12.4 |
2 | 7.70 | 74.3 | 74.0 | 81.10 | 18 | 12.4 |
3 | 0.90 | 74.1 | 74.0 | 70.70 | 18 | 12.4 |
4 | 0.90 | 74.1 | 73.9 | 69.00 | 18 | 12.4 |
5 | 0.90 | 74.2 | 74.0 | 57.80 | 18 | 12.4 |
6 | 1.00 | 74.1 | 74.0 | 57.00 | 18 | 12.4 |
7 | 0.90 | 74.1 | 74.0 | 57.50 | 18 | 12.4 |
8 | 1.00 | 74.1 | 73.9 | 57.30 | 18 | 12.4 |
9 | 1.00 | 74.1 | 74.0 | 57.30 | 18 | 12.4 |
10 | 1.00 | 74.1 | 73.9 | 57.40 | 18 | 12.4 |
11 | 0.90 | 74.1 | 73.9 | 57.80 | 18 | 12.4 |
12 | 0.90 | 74.1 | 73.9 | 57.30 | 18 | 12.4 |
13 | 0.90 | 74.0 | 73.9 | 57.40 | 18 | 12.4 |
14 | 0.90 | 73.9 | 73.8 | 57.30 | 18 | 12.4 |
15 | 1.00 | 73.8 | 73.8 | 57.50 | 18 | 12.4 |
16 | 0.90 | 73.7 | 73.6 | 69.10 | 18 | 12.4 |
17 | 0.90 | 73.6 | 73.6 | 70.70 | 18 | 12.4 |
18 | 0.90 | 73.9 | 73.8 | 70.50 | 18 | 12.4 |
19 | 0.90 | 74.2 | 74.0 | 76.60 | 18 | 12.4 |
20 | 0.90 | 74.3 | 74.2 | 82.70 | 18 | 12.4 |
21 | 1.00 | 74.9 | 74.8 | 70.60 | 18 | 12.4 |
22 | 0.90 | 75.1 | 74.9 | 70.40 | 18 | 12.4 |
23 | 0.90 | 75.0 | 74.9 | 70.30 | 18 | 12.4 |
24 | 1.00 | 75.0 | 74.9 | 68.50 | 18 | 12.4 |
|
AVG | 1.50 | 74.2 | 74.1 | 65.96 | 18 | 12.4 |
|
MAX | 7.80 | 75.1 | 74.9 | 82.70 | 18 | 12.4 |
MIN | 0.90 | 73.6 | 73.6 | 57.00 | 18 | 12.4 |
* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock,
PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in
operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through
the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year
indicate the B2CC is open/closed.