Bonneville Dam
Monday July 6, 2020
Hour | Total Outflow kcfs | Generation Flow kcfs | Spill kcfs | PH 1 Forebay Elevation | Tailwater Elevation | Average Head | Project Forebay Elevation | Stevenson Gage Elevation | Project Tailwater Elevation |
1 | 218.20 | 110.80 | 95.00 | 73.70 | 18.40 | 55.30 | 73.60 | 74.90 | 18.50 |
2 | 204.80 | 97.40 | 95.00 | 73.80 | 17.90 | 55.90 | 73.60 | 74.70 | 17.90 |
3 | 203.20 | 95.10 | 95.70 | 73.70 | 17.70 | 56.00 | 73.50 | 74.60 | 17.70 |
4 | 203.30 | 95.20 | 95.70 | 73.60 | 17.60 | 56.00 | 73.50 | 74.60 | 17.60 |
5 | 203.50 | 95.50 | 95.60 | 73.60 | 17.40 | 56.20 | 73.40 | 74.50 | 17.40 |
6 | 205.50 | 97.60 | 95.50 | 73.50 | 17.50 | 56.00 | 73.30 | 74.50 | 17.40 |
7 | 203.70 | 95.80 | 95.50 | 73.40 | 17.40 | 56.00 | 73.20 | 74.40 | 17.40 |
8 | 209.30 | 101.60 | 95.30 | 73.30 | 17.60 | 55.70 | 73.10 | 74.30 | 17.50 |
9 | 210.20 | 102.60 | 95.20 | 73.10 | 17.80 | 55.30 | 73.00 | 74.20 | 17.50 |
10 | 210.80 | 103.30 | 95.10 | 73.10 | 17.60 | 55.50 | 73.00 | 74.20 | 17.60 |
11 | 212.00 | 104.50 | 95.10 | 73.10 | 17.60 | 55.50 | 73.00 | 74.30 | 17.60 |
12 | 212.20 | 104.80 | 95.00 | 72.90 | 17.80 | 55.10 | 72.80 | 74.20 | 17.70 |
13 | 217.60 | 110.30 | 94.90 | 73.00 | 18.00 | 55.00 | 72.80 | 74.20 | 17.80 |
14 | 217.80 | 110.50 | 94.90 | 72.90 | 17.80 | 55.10 | 72.90 | 74.10 | 17.70 |
15 | 217.60 | 110.30 | 94.90 | 73.00 | 17.80 | 55.20 | 72.90 | 74.20 | 17.70 |
16 | 217.50 | 110.20 | 94.90 | 73.00 | 17.80 | 55.20 | 72.90 | 74.20 | 17.70 |
17 | 209.10 | 101.60 | 95.10 | 73.20 | 17.30 | 55.90 | 73.10 | 74.30 | 17.20 |
18 | 209.30 | 101.70 | 95.20 | 73.20 | 17.40 | 55.80 | 73.10 | 74.30 | 17.20 |
19 | 230.30 | 123.00 | 94.90 | 72.90 | 18.20 | 54.70 | 72.80 | 74.20 | 18.10 |
20 | 232.20 | 124.90 | 94.90 | 73.00 | 18.10 | 54.90 | 72.90 | 74.30 | 18.00 |
21 | 230.20 | 122.60 | 95.20 | 73.30 | 18.10 | 55.20 | 73.20 | 74.50 | 18.00 |
22 | 230.50 | 122.70 | 95.40 | 73.30 | 18.20 | 55.10 | 73.30 | 74.70 | 18.00 |
23 | 246.00 | 138.40 | 95.20 | 73.20 | 18.90 | 54.30 | 73.10 | 74.60 | 18.80 |
24 | 247.50 | 139.90 | 95.20 | 73.30 | 18.80 | 54.50 | 73.20 | 74.60 | 18.70 |
|
AVG | 216.76 | 109.18 | 95.18 | 73.25 | 17.86 | 55.39 | 73.13 | 74.40 | 17.78 |
|
MAX | 247.50 | 139.90 | 95.70 | 73.80 | 18.90 | 56.20 | 73.60 | 74.90 | 18.80 |
MIN | 203.20 | 95.10 | 94.90 | 72.90 | 17.30 | 54.30 | 72.80 | 74.10 | 17.20 |
|
Powerhouse 1 |
Powerhouse 2 |
Project |
Hour | Generation Flow kcfs | Forebay Elevation | Forebay Elevation | Generation Flow kcfs | Spillway Gates in Use | Miscellaneous Flow kcfs* |
1 | 2.60 | 73.7 | 73.6 | 108.20 | 18 | 12.4 |
2 | 0.90 | 73.8 | 73.6 | 96.50 | 18 | 12.4 |
3 | 0.90 | 73.7 | 73.5 | 94.20 | 18 | 12.4 |
4 | 0.90 | 73.6 | 73.5 | 94.30 | 18 | 12.4 |
5 | 0.90 | 73.6 | 73.4 | 94.60 | 18 | 12.4 |
6 | 1.00 | 73.5 | 73.3 | 96.60 | 18 | 12.4 |
7 | 0.90 | 73.4 | 73.2 | 94.90 | 18 | 12.4 |
8 | 0.90 | 73.3 | 73.1 | 100.70 | 18 | 12.4 |
9 | 0.90 | 73.1 | 73.0 | 101.70 | 18 | 12.4 |
10 | 0.90 | 73.1 | 73.0 | 102.40 | 18 | 12.4 |
11 | 1.00 | 73.1 | 73.0 | 103.50 | 18 | 12.4 |
12 | 1.00 | 72.9 | 72.8 | 103.80 | 18 | 12.4 |
13 | 0.90 | 73.0 | 72.8 | 109.40 | 18 | 12.4 |
14 | 0.90 | 72.9 | 72.9 | 109.60 | 18 | 12.4 |
15 | 0.90 | 73.0 | 72.9 | 109.40 | 18 | 12.4 |
16 | 0.90 | 73.0 | 72.9 | 109.30 | 18 | 12.4 |
17 | 0.90 | 73.2 | 73.1 | 100.70 | 18 | 12.4 |
18 | 0.90 | 73.2 | 73.1 | 100.80 | 18 | 12.4 |
19 | 5.50 | 72.9 | 72.8 | 117.50 | 18 | 12.4 |
20 | 9.60 | 73.0 | 72.9 | 115.30 | 18 | 12.4 |
21 | 9.60 | 73.3 | 73.2 | 113.00 | 18 | 12.4 |
22 | 9.50 | 73.3 | 73.3 | 113.20 | 18 | 12.4 |
23 | 28.20 | 73.2 | 73.1 | 110.20 | 18 | 12.4 |
24 | 29.10 | 73.3 | 73.2 | 110.80 | 18 | 12.4 |
|
AVG | 4.57 | 73.3 | 73.1 | 104.61 | 18 | 12.4 |
|
MAX | 29.10 | 73.8 | 73.6 | 117.50 | 18 | 12.4 |
MIN | 0.90 | 72.9 | 72.8 | 94.20 | 18 | 12.4 |
* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock,
PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in
operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through
the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year
indicate the B2CC is open/closed.