TOTAL DISSOLVED GAS REPORT FOR KOOTENAI R. BL LIBBY DAM starting at 2100 19 Apr 2026 WA TM BARO TD GAS TDG DEPTH OF TOT FLOW SPILL DATE TIME DEG F PRES PRES % GAGE(FT) KCFS KCFS 0419 2100 40.5 702.2 714.0 101.7 10.8 19.5 0.0 0419 2200 40.5 702.5 714.0 101.6 10.8 19.5 0.0 0419 2300 40.6 702.8 714.0 101.6 10.8 19.5 0.0 0420 0000 40.5 703.0 714.0 101.6 10.8 19.5 0.0 0420 0100 40.5 703.4 713.0 101.4 10.9 19.5 0.0 0420 0200 40.4 703.7 713.0 101.3 10.9 19.5 0.0 0420 0300 40.3 703.9 712.0 101.2 10.9 19.5 0.0 0420 0400 40.2 703.9 712.0 101.2 10.9 19.5 0.0 0420 0500 40.2 704.1 712.0 101.1 10.9 19.5 0.0 0420 0600 40.2 703.9 711.0 101.0 10.9 19.5 0.0 0420 0700 40.1 703.9 712.0 101.2 10.9 19.5 0.0 0420 0800 40.1 703.6 712.0 101.2 10.8 19.5 0.0 0420 0900 40.1 702.9 713.0 101.4 10.8 19.5 0.0 0420 1000 40.2 702.2 713.0 101.5 10.8 19.5 0.0 0420 1100 40.3 701.6 714.0 101.8 10.8 19.5 0.0 0420 1200 40.5 700.7 716.0 102.2 10.7 19.5 0.0 0420 1300 40.6 699.9 717.0 102.4 10.7 19.5 0.0 0420 1400 40.7 699.4 717.0 102.5 10.7 19.5 0.0 0420 1500 40.7 699.1 718.0 102.7 10.7 19.5 0.0 0420 1600 40.8 698.7 718.0 102.8 10.6 19.5 0.0 0420 1700 40.9 698.4 719.0 102.9 10.6 19.5 0.0 0420 1800 40.8 698.2 718.0 102.8 10.6 19.5 0.0 0420 1900 40.8 698.2 716.0 102.5 10.6 19.5 0.0 0420 2000 40.8 698.7 716.0 102.5 10.7 19.5 0.0 0420 2100 40.8 699.3 716.0 102.4 10.7 19.5 0.0