TOTAL DISSOLVED GAS REPORT FOR ROCK ISLAND starting at 1300 8 Mar 2026 WA TM BARO TD GAS TDG DEPTH OF TOT FLOW SPILL DATE TIME DEG F PRES PRES % GAGE(FT) KCFS KCFS 0308 1300 41.9 741.0 793.0 107.0 + 75.5 0.0 0308 1400 41.9 741.0 793.0 107.0 + 79.1 0.0 0308 1500 42.1 741.0 793.0 107.0 + 67.7 0.0 0308 1600 42.1 741.0 792.0 106.9 + 56.2 0.0 0308 1700 42.1 741.0 792.0 106.9 + 61.4 0.0 0308 1800 42.3 741.0 791.0 106.7 + 125.2 0.0 0308 1900 42.1 741.0 789.0 106.5 + 145.5 0.0 0308 2000 42.1 741.0 788.0 106.3 + 144.2 0.0 0308 2100 42.1 742.0 787.0 106.1 + 144.9 0.0 0308 2200 42.1 743.0 787.0 105.9 + 149.9 0.0 0308 2300 42.1 743.0 789.0 106.2 + 148.2 0.0 0309 0000 42.1 744.0 789.0 106.0 + 150.7 8.3 0309 0100 42.1 744.0 790.0 106.2 + 147.0 3.7 0309 0200 41.9 744.0 789.0 106.0 + 143.1 0.0 0309 0300 41.9 744.0 788.0 105.9 + 124.2 0.0 0309 0400 41.7 744.0 787.0 105.8 + 124.2 0.0 0309 0500 41.7 744.0 786.0 105.6 + 125.4 0.0 0309 0600 41.7 745.0 786.0 105.5 + 118.4 0.0 0309 0700 41.5 745.0 785.0 105.4 + 129.8 0.0 0309 0800 41.5 746.0 784.0 105.1 + 142.2 0.0 0309 0900 41.5 746.0 784.0 105.1 + 127.7 0.0 0309 1000 41.7 746.0 783.0 105.0 + 111.8 0.0 0309 1100 41.7 746.0 783.0 105.0 + 77.2 0.0 0309 1200 41.7 745.0 783.0 105.1 + 83.6 0.0 0309 1300 + + + + + 85.7 0.0